We are glad you are as excited about BEC broadband as we are! We will keep you updated through email and social media as we have more information about our pilot programs.
Bec splas image

BEC Fiber, a division of Bandera Electric Cooperative, is a grassroots movement that is empowered by you, our members. BEC Fiber is now bridging the digital divide to bring high speed internet to rural Texas through our fiber internet program.

 How does the process work?

  1. View our available packages by clicking the products tab above.
  2. See which zones have met their goal for service, and view your community’s progress in the zones tab above. The construction plans are developed based on member interest in the form of pre-registration.
  3. Are you ready for high speed internet? Pre-register today, and share the news on Facebook or send your neighbors free postcards.
  4. Stay connected, and view our updates and announcements.

 

Chartered in 1938, Bandera Electric Cooperative distributes electricity to more than 25,000 members and more than 34,000 active meters across seven counties in the Texas Hill country, and has for 79 years. Approximately 90 employees operate and maintain more than 4,500 miles of power lines. BEC is a not-for-profit utility and is locally owned and operated by the members we serve.

Please, join us!

 

If you need technical support for BEC Fiber please call 866-226-3372.

Zones in Pre-Registration

Areas where a goal must be met before service will be made available.


About BEC Broadband



50 Mbps Internet

Built to keep you and your family online and on the go! Your family will be able to connect multiple devices at the same without any slowing of internet speed. No data restrictions.

*$99 installation reflects installation inside your home. Installation construction costs  from BEC poles to your home vary depending upon distance and connection requested. All members who sign a contract will receive a credit of up to $600 towards their construction/service extension costs.

 

$49.99

100 Mbps

Choose this package to give your internet a little more horsepower, surf faster, stream more, and connect more. No data restrictions. 

*$99 installation reflects installation inside your home. Installation construction costs  from BEC poles to your home vary depending upon distance and connection requested. All members who sign a contract will receive a credit of up to $600 towards their construction/service extension costs.

 

$69.99

1 Gig

Surprise! BEC Fiber is adding 1 Gig service to our offering. That's right ... surf all you can surf, unleash the power of the internet, stream all you can stream ...  There are no data caps on BEC's service. 

*$99 installation reflects installation inside your home. Installation construction costs  from BEC poles to your home vary depending upon distance and connection requested. All members who sign a contract will receive a credit of up to $600 towards their construction/service extension costs.

 

$149.99

Residential Telephone

Unlimited local and long distance calling.  Tons of free calling features, all served through the same fiber cable as the internet.

*Internet service must be purchased for phone to be available.  No additional installation charge for the phone service.


$19.95

50 Mbps Business

Built to get your business online and on the go! You will be able to connect multiple devices at the same without any slowing of internet speed. No data restrictions.

*$99 installation reflects installation inside your business. Installation construction costs from BEC poles to your business vary depending upon distance and connection requested. All members who sign a contract will receive a credit of up to $600 towards their construction/service extension costs.


$89.99

100 Mbps Business

Choose this package to give your business internet a little more horsepower, surf faster, stream more, and connect more. No data restrictions. 

*$99 installation reflects installation inside your business. Installation construction costs from BEC poles to your business vary depending upon distance and connection requested. All members who sign a contract will receive a credit of up to $600 towards their construction/service extension costs.


$119.99

1 Gig Business

Extra horsepower for bigger businesses, surf all you can surf, stream all you can stream, unleash the power of the internet ...  All with no data caps.

*$99 installation reflects installation inside your business. Installation construction costs  from BEC poles to your business vary depending upon distance and connection requested. All members who sign a contract will receive a credit of up to $600 towards their construction/service extension costs.


$299.99

Business Telephone

Unlimited local and long distance calling.  Tons of free calling features, all served through the same fiber cable as the internet.

*Internet service must be purchased for phone to be available.  
*Business phone installation will be quoted on an individual customer basis.


$34.95



About this Campaign

BEC Fiber, a division of Bandera Electric Cooperative, is a grassroots movement that is empowered by you, our members. BEC Fiber is now bridging the digital divide to bring high speed internet to rural Texas through our fiber internet program.

 How does the process work?

  1. View our available packages by clicking the products tab above.
  2. See which zones have met their goal for service, and view your community’s progress in the zones tab above. The construction plans are developed based on member interest in the form of pre-registration.
  3. Are you ready for high speed internet? Pre-register today, and share the news on Facebook or send your neighbors free postcards.
  4. Stay connected, and view our updates and announcements.

 

Chartered in 1938, Bandera Electric Cooperative distributes electricity to more than 25,000 members and more than 34,000 active meters across seven counties in the Texas Hill country, and has for 79 years. Approximately 90 employees operate and maintain more than 4,500 miles of power lines. BEC is a not-for-profit utility and is locally owned and operated by the members we serve.

Please, join us!

 

If you need technical support for BEC Fiber please call 866-226-3372.

Check out who's already registered!


E106ecc483b673f0e9feb9cdaec490ed

Vicente Garcia

Medina Lake Area
14da4619908eb8095acc85aeff45bd9c

Paul Franchett

Bandera Area
Cbdee0f98b3dc54d4a74ccafbfcb6888

Bill Greer

Remote
00000000000000000000000000000000

Anonymous

Bandera Area
Fa2e8e2e1bba592527389042d763e984

Robert Chambers

Medina Lake Area
00000000000000000000000000000000

Anonymous

Medina Lake Area


How many internet users are there in the world today?

9:15am September 5, 2017

December 1997: 16 million users, 0.4% of the world population

.

.

.

September 2007: 1,245 million users, 18.9% of the world population

.

.

.

June 2017: ???? million users, ???? of the world population

Check out Internet World Stats to find out!

Speeds just as fast up as they are down!

1:06pm August 31, 2017

With #BECFiber you can enjoy our symmetrical internet connection, where your upload speeds are just as fast as your download speeds! #GetConnected #50Mbps #100Mbps #1Gig

Broadband Across Texas

11:30am August 22, 2017

Electric co-ops around Texas are beginning to provide rural broadband service, just as they supplied electricity to the  countryside decades ago.

Read full article at:

Broadband Across Texas

BEC Fiber Facebook is Live!

9:14am July 17, 2017

The #BECFiber Facebook page is now live! Please go like and share our page at facebook.com/BECFiber

100th BEC Fiber Customer Connected

9:25am July 11, 2017

We are excited to launch our #BECFiber Facebook page and announce that we have connected our 100th fiber customer in the Boerne Pilot area.


#100thCustomer #Connected

The Boerne Pilot now has BEC Fiber.

8:11am June 20, 2017

A ribbon cutting was held at the Gonzales residence to celebrate the first BEC Fiber install. 

Recruit Your Neighbors!

2:23pm April 25, 2017

Send post cards to your neighbors for FREE! This is a great tool to spread the word about Fiber and get others to join the campaign.

Simply go to "MY DASHBOARD"  and under "SPREAD the WORD," there is a link to "Invite by Postcard." 

Join us for the 78th Annual Meeting and Energy and Technology Fair!

1:52pm April 19, 2017

On Saturday, May 20, 2017 BEC will be hosting its 78th  Annual Meeting and Energy and Technology Fair at Mansfield Park in Bandera. This is the perfect place to ask questions, voice your opinions, and participate in the business of the cooperative. We look forward to seeing you there!

BEC employees will be dual certified!

10:54am April 18, 2017

BEC employees are undergoing testing to become Certified Fiber Splicers!

 

Boerne Construction Update

8:29am April 10, 2017

Boerne construction is now 40 percent complete. We will begin turning up subscribers in late April! Thank you for your continued patience and excitement.

What's in a Number?

11:11am April 4, 2017

For those of you who want to know how zones were created and how we calculate the percentage to goal, this update is for you!

The zones are not based off of zip codes, but rather population density in relation to the existing BEC electric poles and infrastructure. The goal for a particular zone is 50 percent of active residential and commercial meters. This excludes meters for gates, barns, wells, etc. The following graph depicts actual backers for each zone, the goal for that zone and the calculated percentage.

The pilot project is 20-percent complete!

10:50am March 20, 2017

Contractors will begin installing backbone fiber this week. (Backbone is a larger transmission line that carries data gathered from smaller lines that interconnect with it.) Member installations are expected to begin in late April.

Backbone Fiber

Construction in Progress!

1:09pm March 1, 2017

Construction in Progress

BEC Fiber reached a major milestone when construction began in Boerne on February 23, 2017. Like much of our service territory, this area is currently without any high-speed internet options. However, these members took matters into their own hands, banded together and pushed the initiative in North Boerne. 

Will your community be next?

2:38pm February 27, 2017

To help raise awareness we wanted to let you know how you can help. We appreciate our members support, patience and questions while we work to launch BEC Fiber service.

  • Login to your joinbec.banderaelectric.com and send postcards to all those in your area for FREE, we cover everything!
  • Let others in your area know that all homes and businesses can preregister NOW. They do not have to wait until a goal is set. Interest levels from preregistration will guide our construction process. Your community could be next when enough people preregister.
  • Follow us on Facebook, like and share all of our posts.
  • Let us know what questions you have or have heard in the community by posting comments on our BEC Fiber comment page or give us a call at 866.226.3372.

Why Boerne? Don't they already have high-speed internet?

8:52pm February 1, 2017

Many have asked why BEC's first fiber pilot is being built and tested in North Boerne.  This is an interesting story. There is an area north of Boerne, on the way to Sisterdale that is in a "dead zone" for any type of high-speed internet. The people who live in this area are BEC members, and have satellite internet and cell phone data as their only internet options -- not unlike many other BEC neighborhoods.  A year ago, BEC was not aware of the internet issues in this area. However, one frustrated BEC member and his neighbors took it upon themselves to "rally the troops" to bring high-speed internet to their homes.  

It all started with a free online petition and neighborhood website, door to door canvasing by volunteers and many emails to BEC.  This neighborhood's grass roots efforts caught our attention.  BEC called a town hall meeting last summer and the room was packed with these neighbors asking that we listen to their needs and help them to bridge the "digital divide," improving their quality of life.

We asked them to get 50% of their neighborhood, and the surrounding neighborhood to sign up, and we promised take the proposal to the BEC board of directors for consideration of a pilot project.  This group of grassroots advocates did just that. Within weeks, the Boerne pilot was approved and the BEC Fiber (formerly BEC Broadband) staff hit the ground running!

Since then, the interest from other neighborhoods in the BEC service territory has grown exponentially, and BEC introduced this site to help members manage the interest.  Just as we did 78 years ago when BEC brought electricity to the area, we are working to bring you high-speed internet.  But, just like 78 years ago, it takes time to develop and build the infrastructure.  We see the interest keeps growing and we need our member-owners to help us keep the momentum going forward. 

This is where you come in. Please, attend the town hall meetings, come to the Annual Meeting (Sat, May 20), sign up on this site, talk to your friends and neighbors and please help to spread the word! This is your cooperative and we are here to provide you reliable service and improve your quality of life the best we can.  

We have a new look and the fiber is here!

4:06pm January 30, 2017

BEC Broadband has changed our name to BEC Fiber and our logo to better reflect our "fiber to the home" initiative.

And guess what else?

The fiber has arrived!

Construction in North Boerne is about to begin.  like much of our rural service territory, this area is currently without any high-speed internet options. However, these members took matters into their own hands, banded together, got the required signatures and pushed the initiative in North Boerne. 

We are happy to be able to bring high-speed internet to our members in this area. 

 

BEC Fiber Town Hall Meetings

2:03pm January 30, 2017

We are ramping up our project and are seeing a significant number of sign ups across our territory!  Keep up the good work.  BEC Fiber will be holding town hall meetings in Bandera, Boerne and Lakehills this month. We encourage you to attend all or one of the meetings to ask your questions and learn about our project and the future of BEC Fiber.  

Bandera Town Hall
Thursday Feb 9, 6-7 p.m.

BEC Community Room
Bandera Electric Cooperative
3172 State Highway 16 North
Bandera, TX 78003

Boerne Town Hall
Friday Feb 17, 6-7 p.m.

Patrick Heath Public Library
451 N. Main Street
Boerne, TX 78006

Lakehills Town Hall
Thursday Feb 23, 6-7 p.m.

Lakehills Civic Center
PR 37 
Lakehills, TX 78063

Keep Signing Up!

3:45pm January 23, 2017

Our broadband pilot is well on the way in Boerne.  Pipe Creek and Lakehills are quickly following behind. Please encourage all of your friends and neighbors to sign up to get your zone up to 50 percent. At that point, we can present our new broadband plan to the board of directors.

Not in an active zone?  Never fear, we are adding new zones soon.  Feel free to sign up now, and the zones will capture your information if you fit into it. 

Thank you for supporting this grassroots movement of our member-owners.  Please continue to monitor this page for updates!

Things are moving along in Boerne pilot area!

3:42pm January 23, 2017

BEC is completing the planning stage of our pilot at this time. You may receive a call, letter, or visit from a BEC contractor regarding access to an easement on your property. Should you have any questions regarding this, please call 866-226-3372.

With completion of phase 1, we expect to begin construction in Boerne in mid to late February, with home installation following completion of our network construction. 

At this time, we are still finalizing all plans.  There have been no BEC broadband internet home installations yet, but we will contact you when we are ready to install. If you sent in paperwork from a town hall meeting or have signed up on CrowdFiber, we have your information and will contact you as soon as it is available in your neighborhood.  

Please, continue to monitor our progress on this page.

 

Bandera Wireless Pilot Update

8:50am December 9, 2016

BEC has decided to discontinue the pilot program. It is always BEC’s primary mission to provide value added services to our members at a reasonable cost and through responsible business practices. During the design and construction of the pilot wireless network, the equipment did not perform as we had hoped, nor was it readily available.

Instead, we have decided to continue with a “fiber to the home” broadband project. We are asking that all members interested in broadband fiber internet sign up here on CrowdFiber. If you were a member on the Bandera wireless pilot, your name has already been added to CrowdFiber. However, it is recommended that you create an account as this is the best place to get updates on the project. As a zone reaches 50 percent member interest, BEC will begin planning and design.

BEC Free Wi-Fi will still be available in Bandera on Main Street and at the Mansfield and Bandera City parks for public use.  Thank you for your continued patience. 

Boerne Broadband Update

10:02am December 1, 2016

The Boerne broadband project is slated to begin construction in late January 2017.  We will keep you updated through email and social media as we have more information about the project. If you have any questions please feel free to contact us at PublicRelations@banderaelectric.com.

 

PostCards are Now Live!

10:26am November 3, 2016

Did you know that you can now send postcards to your neighbors who have not yet signed up for broadband?  Login to your account, and you will see the option to send up to two post cards per month to your neighbors. Your hard work will keep this movement growing!

Hello! Welcome to BEC Broadband.

10:12am October 10, 2016

Thank you for joining us as we endeavor to bring Broadband to our BEC members in the Texas Hill Country.  As we begin to bridge the digital divide, implement and test pilot programs, and design and grow our service, we will be posting updates here, at joinbec.banderaelectric.com.  Please, continue to follow this site, share on your social media and encourage your friends and neighbors to sign up.

You are all member-owners of BEC and this broadband initiative is in response to your, and your neighbors', efforts to improve your communities.  

Thank you,
Bandera Electric Cooperative



You must be logged in to comment


Bandera Electric Broadband Pilot - Allen Marshall

3:24pm October 18, 2017

Allen Marshall
Campaign Owner

@John Goode - I'm glad you got hooked up! We are now taking applications in the area where your church is.


Bandera Electric Broadband Pilot - Allen Marshall

3:23pm October 18, 2017

Allen Marshall
Campaign Owner

@Norma Erosa - The area between Madrona Ranch Road and Latigo Blvd will be our first Pipe Creek are to build. Staring very soon, we are taking applications in that area.


Bandera Electric Broadband Pilot - Allen Marshall

3:20pm October 18, 2017

Allen Marshall
Campaign Owner

@Chuck Milks - We have identified your area for a possible 2018 build. We hope to hurry and help you!


Bandera Electric Broadband Pilot - John Goode

7:58am October 18, 2017

John Goode

WOW! 53Mbps up and down. It was definitely worth waiting for. Perhaps the best part was the courteous, professional and just plain nice installation team!


Bandera Electric Broadband Pilot - Harold Schmidt

6:27pm October 16, 2017

Harold Schmidt

Chuck Milks You should be able to get rock solid wireless there until BEC get to where you are.


Bandera Electric Broadband Pilot - Norma Erosa

10:59am October 16, 2017

Norma Erosa

Mr. Marshall, what constitutes Northern Pipe Creek?


Bandera Electric Broadband Pilot - Chuck Milks

11:58am October 15, 2017

Chuck Milks

Please get your service out on Mountain Drive just past the county park ASAP We currently have NO Internet Service available Not Even Dial Up It is Horrible We have to use our cell phones as a Hot Spot to do anything at all , PLEASE HELP US!!!!


Bandera Electric Broadband Pilot - John Goode

9:08am October 12, 2017

John Goode

Thanks, Allen. I have added the payment information to our web site. I am anxious to get the service here. My AT&T DSL goes down every afternoon when the temperature gets over about 85 degrees (like it will today), and AT&T can not find the problem. Our street (Oak Hills Drive in Flying-L) is complete with the main fiber running out to Bottle Springs Road but not connected to the fiber at the road. Is there an estimate of when that line will be hot?


Bandera Electric Broadband Pilot - Harold Schmidt

8:26am October 11, 2017

Harold Schmidt

Nathan VanEpps If you read past comments Pipe Creek is next on the install list. I understand they have 3 crews on the install. Medina lake supposed to be by end of year but not holding breath. I have seen crew's out hear scoping it out so mabye right after the first. AT least you have the main fiber line in pipe creek we have nada.


Bandera Electric Broadband Pilot - Allen Marshall

5:03pm October 10, 2017

Allen Marshall
Campaign Owner

@John Goode - Our admin has changed the comments section to needing approval for comments before they show up. Our reliability has been great! We have not had any equipment issues and only a few fiber splicing issues, more than likely from a battery powered splicer that was not calibrated correctly. The fiber service will be added to your electric bill and called out separately before showing the total bill of electric and fiber together.


Bandera Electric Broadband Pilot - William  Rotureau

10:34pm October 9, 2017

William Rotureau

Any updates for Bandera River Ranch? Thanks!


Bandera Electric Broadband Pilot - John Goode

1:25pm October 9, 2017

John Goode

Two questions: 1. How will the BEC fiber be charged (ie, separately or with current BEC electric bill)? 2. Do you have a link to the details of the telephone service? Thanks!


Bandera Electric Broadband Pilot - John Goode

11:55pm October 8, 2017

John Goode

Allen - Why have my recent comments and questions been removed from this forum?


Bandera Electric Broadband Pilot - Nathan VanEpps

5:17pm October 8, 2017

Nathan VanEpps

Is there any word when fiber will be coming to Pipe Creek Area I'm ready to pay as much as I need to.


Bandera Electric Broadband Pilot - John Goode

8:26am October 8, 2017

John Goode

What has been the reliability of the BEC fiber internet connection after it is first turned on? They are connecting customers here in the Flying-L now, and I was wondering how long I should keep my existing AT&T internet as a backup after I am connected to fiber.


Bandera Electric Broadband Pilot - John Goode

12:55pm October 5, 2017

John Goode

Does your fiber connection to the home use PTP to the CO or do you use multiplexing?


Bandera Electric Broadband Pilot - Jordan Leal

9:16am October 4, 2017

Jordan Leal

If I'm not mistaken the Boerne pilot area was the first area to get it jose.. Have you went to the BEC office and paid the 99$ installation fee?


Bandera Electric Broadband Pilot - JOSE NIETO

9:08pm October 3, 2017

JOSE NIETO

I live in the Boerne Pilot area is there word when Bandera Fiber coming to this area. Please hopefully soon.


Bandera Electric Broadband Pilot - Karl  Hodson

3:01am October 1, 2017

Karl Hodson

Allen, What is the status for the Lake Country subdivision on fm 1283 near pk rd 37? Thank you, Karl Hodson


Bandera Electric Broadband Pilot - Jordan Leal

7:19pm September 28, 2017

Jordan Leal

Awesome thank you Allen I'm sure I speak for everybody you have done a awesome job trying to keep up with all the questions


Bandera Electric Broadband Pilot - Charles Talbot

11:56am September 28, 2017

Charles Talbot

Could you kindly advise me about schedule of connections in Pipe Creek, specifically along Cypress Park Lane? Thanks. Charles Talbot


Bandera Electric Broadband Pilot - Allen Marshall

4:34pm September 27, 2017

Allen Marshall
Campaign Owner

@Jordan Leal - We should start hooking people up in November in Bandera Ranch Acres and Bandera River Ranch


Bandera Electric Broadband Pilot - Jordan Leal

4:04pm September 27, 2017

Jordan Leal

Is there a estimated date for when the internet will be ready for Bandera ranch acres?


Bandera Electric Broadband Pilot - Allen Marshall

2:48pm September 27, 2017

Allen Marshall
Campaign Owner

I can only share our construction schedule as far out as we have contracts lined up. Right now we are building in Flying L, Bandera River Ranch, Bandera Ranch Acres, and we will be starting northern Pipe Creek very soon.


Bandera Electric Broadband Pilot - Robert Utz

10:41am September 26, 2017

Robert Utz

What is the estimated installation start date for the Bridlegate Subdivision?


Bandera Electric Broadband Pilot - Gary Martel

9:42am September 25, 2017

Gary Martel

What is the estimated construction start date on Timber Creek Road and other roads in that area?


Bandera Electric Broadband Pilot - Harold Schmidt

6:57pm September 20, 2017

Harold Schmidt

Lynne Randle Yes you go to BEC and fill out form. If you are in construction you pay your 99.00 install fee.


Bandera Electric Broadband Pilot - Lynne Randle

4:54pm September 20, 2017

Lynne Randle

How do we make application for service? Do we have to go to BEC Office? We are located on Deer Creek West in Pipe Creek and I think I understand that construction should begin in October, correct? Thanks, Lynne


Bandera Electric Broadband Pilot - ISIDORO GARCIA

2:44pm September 19, 2017

ISIDORO GARCIA

What is the estimated construction start date on the Oil Well Rd E by Roller Coaster Rd Area? (Castle Lake Ranch)


Bandera Electric Broadband Pilot - Jordan Leal

7:50am September 19, 2017

Jordan Leal

What's the projected turn on date for Bandera ranch acres?


Bandera Electric Broadband Pilot - John Goode

9:39am September 18, 2017

John Goode

Thanks, Allen. I am not sure what name and number was put on the interest sign-up for the church, but please add me to the contact information so I can be sure the contract gets done. My phone number is 796-9684.


Bandera Electric Broadband Pilot - Allen Marshall

9:04am September 18, 2017

Allen Marshall
Campaign Owner

@John Goode - The PON cabinets are going in this week in Flying L so we should start turning people up this week or next week. Your church is located in the next area due for construction. We should start taking applications soon and starting construction in October.


Bandera Electric Broadband Pilot - Allen Marshall

9:02am September 18, 2017

Allen Marshall
Campaign Owner

@Jason Lewis - We are taking applications in the Bandera Ranch Acres subdivision now. Please go to an office and fill out an application and tell you neighbors. Thanks for your support


Bandera Electric Broadband Pilot - Allen Marshall

9:00am September 18, 2017

Allen Marshall
Campaign Owner

@Jennifer Karre - Castle Lake Rd is located in one of the areas we have designated for construction. We don't have an estimated start date at this time though.


Bandera Electric Broadband Pilot - John Goode

8:03am September 18, 2017

John Goode

Harold, We are getting close. I actually have a fiber connection box on my house and there is some fiber run on our street, but there are gaps and no fiber run to the outside world. Hopefully the crews will return soon and finish the job. A lot of the fiber at the Flying-L has to be run underground which slows them down. They had to put in about 100 feet of conduit to bring it to my "island" street (surrounded by fairways). My AT&T DSL is failing fast - drops connection up to 20 times a day!


Bandera Electric Broadband Pilot - Harold Schmidt

9:14pm September 17, 2017

Harold Schmidt

John Goode looks like you are close. Arrrrrrggggg i had to pay Rock Solid $74.00 for whatever the mood is today. Oh well


Bandera Electric Broadband Pilot - John Goode

9:42am September 12, 2017

John Goode

Our church (Hill Country Chapel) is located in Pipe Creek at 886 Mountain View Lane (off of 46). I am pretty sure they signed up as interested. When will BEC accept an application from us and what is the projected installation date? We are moving into our new building early next year and need to make internet and phone plans. We are currently using Exede satellite internet and AT&T landline (2 numbers).


Bandera Electric Broadband Pilot - Jennifer  Karre

8:32am September 12, 2017

Jennifer Karre

What is the probability that we will get fiber way out here on Castle Lake Road? Anytime soon? (Fingers Crossed )


Bandera Electric Broadband Pilot - Jason Lewis

4:15pm September 11, 2017

Jason Lewis

Saw Fiber being installed on Polly Peak in Bandera today. Is that BEC or do I need to find out what company will be providing Fiber to me shortly?


Bandera Electric Broadband Pilot - Allen Marshall

2:37pm September 11, 2017

Allen Marshall
Campaign Owner

@Tom McCray - We have not been able to duplicate your problem yet. Maybe you already sent a card to everyone in your area. Thanks for your help!


Bandera Electric Broadband Pilot - Allen Marshall

2:36pm September 11, 2017

Allen Marshall
Campaign Owner

@Jeff Lasiter - We should be starting construction in your area sometime in October. We still need to get some work done at the substation before we can start. Thanks for your support!


Bandera Electric Broadband Pilot - Jeff Lasiter

12:36pm September 11, 2017

Jeff Lasiter

I'm am absolutely thrilled that this service is coming to the Pipe Creek area. This has to be the only service unavailable to us and now that it is coming this will be a dream come true. I have seen survey men out doing pole inspections here on Diamond J Rd South out along Hwy 16 too. Is there a projected installation period for this street so I can make sure the utility crews have fresh tacos and coffee EVERY MORNING! :) :) :)


Bandera Electric Broadband Pilot - Tom McCray

10:43am September 11, 2017

Tom McCray

@Allen Marshall - Still having this problem: I was going to send my "five postcards" again this month, but there is now a message "Unfortunately, we could not locate any neighbors near your location." I have sent postcards many months previous, including last month. Any ideas?


Bandera Electric Broadband Pilot - Allen Marshall

10:18am September 11, 2017

Allen Marshall
Campaign Owner

@Rodney Scharich - We started construction on Bandera River Ranch last week. We hope to start turning people up sometime in October.


Bandera Electric Broadband Pilot - Harold Schmidt

9:21am September 11, 2017

Harold Schmidt

Thanks That makes sense i believe main fiber from sa comes out of pipe creek. So im guessing fiber will go across English crossing . That will cover lake hills, Bandera river falls,bridlegate, then lake medina . I think i seen crews out lake medina scopeing out. GREAT


Bandera Electric Broadband Pilot - Rodney Scharich

8:27am September 11, 2017

Rodney Scharich

What are the plans for Bandera River Ranch? When do you think we will start seeing folks actually using BEC Fiber in BRR?


Bandera Electric Broadband Pilot - Allen Marshall

8:13am September 11, 2017

Allen Marshall
Campaign Owner

@Harold Schmidt - We will be setting our building at the existing Electric Substation site on FM 1283.


Bandera Electric Broadband Pilot - Ryan Ussery

7:38pm September 9, 2017

Ryan Ussery

Allen Please post a basic timeline and order of neighborhoods that will get service. Will we get notifications when to print applications and send money?


Bandera Electric Broadband Pilot - Ryan Ussery

7:38pm September 9, 2017

Ryan Ussery

Allen Please post a basic timeline and order of neighborhoods that will get service. Will we get notifications when to print applications and send money?


Bandera Electric Broadband Pilot - Harold Schmidt

5:08pm September 8, 2017

Harold Schmidt

Allen do you know where the substation will be


Bandera Electric Broadband Pilot - Allen Marshall

4:49pm September 8, 2017

Allen Marshall
Campaign Owner

@Tom McCray - Nothing new as far as a timeline. A conduit for fiber is going in with all phases. I just reviewed plans for unit 3 today actually. We will start in Medina Lake area this year and will work our way out from the substation.


Bandera Electric Broadband Pilot - Tom McCray

3:24pm September 8, 2017

Tom McCray

@Allen Marshall - any news on plans for Summit Ridge? (Medina Lake zone).


Bandera Electric Broadband Pilot - Allen Marshall

9:03am September 8, 2017

Allen Marshall
Campaign Owner

@Joe Salas - If we can get our new building set at Medina Lake by October, we hope to be serving Lakewood Estates by the end of the year.


Bandera Electric Broadband Pilot - Allen Marshall

9:02am September 8, 2017

Allen Marshall
Campaign Owner

@Perry Allen & John Goode - We are only taking money from customers that are in a current construction zone at this time. We will be doing some meetings and taking applications on site as we get further from the home office. We may be able to start taking online applications in the near future too. Thank you to everyone for your patience during the fiber build out.


Bandera Electric Broadband Pilot - John Goode

8:56am September 8, 2017

John Goode

Harold Schmidt - They are still running fiber in the ranch, but nothing hooked up yet. I live on a street surrounded by the golf course (no overhead services), and this week they finished installing the underground conduit for the fiber to our street. That was quite an operation to watch! My AT&T DSL is failing frequently, so I am hopeful that the fiber will be here soon.


Bandera Electric Broadband Pilot - Harold Schmidt

3:41pm September 7, 2017

Harold Schmidt

Hey John Goode you get fiber yet. I see its on the poles


Bandera Electric Broadband Pilot - Joe Salas

5:07pm September 6, 2017

Joe Salas

What is the time frame for installation in Lakewood Estates?


Bandera Electric Broadband Pilot - Joe Salas

5:06pm September 6, 2017

Joe Salas

Will your phone service let me keep my current landline number? Will l I be able to use all the phones in my house or will I be limited to just one phone that connects to the fiber?


Bandera Electric Broadband Pilot - Joe Salas

5:01pm September 6, 2017

Joe Salas

What is your time frame for installations in Lakewood Estates? Thanks.


Bandera Electric Broadband Pilot - Perry Allen

12:17pm September 6, 2017

Perry Allen

Allen - it would seem to be much easier for BEC and also us as Stakeholders to have a complete signup page on your website. This should also include the ability to pay for the installation plus services. Being part of the Medina Lake area (which comprises the largest number of users); I am certain that my neighbors do not want to drive to Bandera if this can be done online! Also is there a project schedule available yet for Pike Creek and Medina Lake Area?


Bandera Electric Broadband Pilot - Allen Marshall

7:50am September 6, 2017

Allen Marshall
Campaign Owner

Jordan- You will need to go to one of our offices and fill out an application for service and pay a $99 installation charge. Harold - You are still out of our construction area so they couldn't take your money yet.


Bandera Electric Broadband Pilot - Jordan Leal

7:20pm September 5, 2017

Jordan Leal

I just filled out the info that the website asked for didn't know we had to go to a office


Bandera Electric Broadband Pilot - Harold Schmidt

1:18pm September 1, 2017

Harold Schmidt

I stoped by office and was told when they get closer they will contact me for install fee.


Bandera Electric Broadband Pilot - Harold Schmidt

1:18pm September 1, 2017

Harold Schmidt

I stoped by office and was told when they get closer they will contact me for install fee.


Bandera Electric Broadband Pilot - Harold Schmidt

9:03am September 1, 2017

Harold Schmidt

Were we suposes to pay tje 99 then???


Bandera Electric Broadband Pilot - Harold Schmidt

9:03am September 1, 2017

Harold Schmidt

Yep went to.main office and signed the form for the 50 at 49.99 a.mounth and also mark for the maintenance plan. He told me it would be 2 years. Hope not


Bandera Electric Broadband Pilot - Allen Marshall

8:18am September 1, 2017

Allen Marshall
Campaign Owner

@Harold Schmidt @Jordan Leal - Do you know what paperwork you did? Did you fill it out or turn it in at one of our offices?


Bandera Electric Broadband Pilot - Jordan Leal

5:50am September 1, 2017

Jordan Leal

Same here I did paper work but knew nothing about 99 installation fee. How do I pay that?


Bandera Electric Broadband Pilot - Harold Schmidt

7:43pm August 31, 2017

Harold Schmidt

Hm i did the paperwprk but no one said anything about the 99.00 fee??


Bandera Electric Broadband Pilot - Allen Marshall

4:10pm August 31, 2017

Allen Marshall
Campaign Owner

@Jordan Leal - If you filled out the paper application and paid the $99 installation fee you should be good to go!


Bandera Electric Broadband Pilot - Jordan Leal

6:33pm August 30, 2017

Jordan Leal

Awesome thank you Allen is there anything else I need to do besides that initial paper that asked address and speed?


Bandera Electric Broadband Pilot - Allen Marshall

10:38am August 29, 2017

Allen Marshall
Campaign Owner

@Jordan Leal - We are planning that area right now and will be putting equipment in our substation up there to start serving people. We should be done before the end of the year in that area.


Bandera Electric Broadband Pilot - Jordan Leal

9:06pm August 28, 2017

Jordan Leal

Just wondering when this internet service will be available in the polly peak neighborhood?


Bandera Electric Broadband Pilot - Harold Schmidt

1:54pm August 23, 2017

Harold Schmidt

Ok yep im signed up did the paper work. Will keep a look out.


Bandera Electric Broadband Pilot - Harold Schmidt

5:40pm August 22, 2017

Harold Schmidt

Thanks alen i will get on it AND go to office tomorrow so all my i i i s are dotted.


Bandera Electric Broadband Pilot - Allen Marshall

4:57pm August 22, 2017

Allen Marshall
Campaign Owner

We would like to have 1" conduit from the pole to the house if people are placing it. Also make sure to use the "sweeping" 90 degree bends, not water pipe 90s. We are counting on getting 1 mile of cable placed per day from here on out, so Daniel is correct in saying get your applications in sooner rather than later when we are in your area. We are having to go back to more than 50 locations in Boerne where the applications came in after the contractor's deadline. We have a new contractor working now and the progress is picking up. We are going over the plans for Pipe Creek as we speak and hope to start over there soon. Thanks to everyone for your patience and support!


Bandera Electric Broadband Pilot - Harold Schmidt

4:25pm August 22, 2017

Harold Schmidt

Thanks They are are Flying L Subdivision Now . It is in the red still like us. I don't know where they will go next. We are 8 miles from there . The crew told me they had 3200 mile to do and BEC was hiring two more crews to get going. I see Pipe Creek is at 59% now.. Any one from Pipe Creek have Fiber??? We don't Have any wire out here at all. I see they run a line just above the phone line then tie fiber to that we are a long way from there . I hope this year but not counting on it. I will start putting money aside to help pay for this. i might start burying conduit for to run. I see no 90. i only need 2 corners from pole to house. What size conduit did you need. I know its the grey electrical.


Bandera Electric Broadband Pilot - Daniel Shelton

2:57pm August 22, 2017

Daniel Shelton

Harold : I am on the west edge of the Boerne pilot area. You will know they are close when you see them hooking fiber from the power poles to a box on the side of the house. I would pay the installation fee as soon as possible. I talked to the contractors doing the fiber to the side of the house and they like to do a bunch in one area at a time since it saves time. I also thought I heard- and please correct me Allen if I am wrong - BEC can run about 2 miles of fiber a day on the street poles, so once they are in the area it happens pretty quick. They seem to do the installation in three sections (along the street poles, from street pole to side of house, outside of house to inside). In my case, the fiber from the street pole to the side of the house was done first.


Bandera Electric Broadband Pilot - Harold Schmidt

8:39am August 22, 2017

Harold Schmidt

Daniel Shelton If you dont mind where are you at. I see they got fiber on the pole at flying l but not hooked up to the main line yet. But it looks like moving along. Like i figured to get to medina lake m section. Thay will be hoing down english crossing road.


Bandera Electric Broadband Pilot - Daniel Shelton

7:43am August 22, 2017

Daniel Shelton

Got installed yesterday. Had a 14:15 appointment and the installers got there at 14:16 - they drove by the drive way and had to back up so that cost them the minute. Installation was a bit more of a pain than I hoped. I had installed flexible conduit with a pull string in the attic to run the fiber in. There were too many turns in the conduit and this caused a lot of friction so we had to bypass the conduit for about half the run - even wire pull lube did not help. I signed up for 50Mbps and am getting the following (latency: 18ms, download: 52.35Mbps, upload: 50.46Mbps). Talking to the installers who are BEC contractors, they said that they have done over 200 installs.


Bandera Electric Broadband Pilot - Jonathan Copeland

9:50pm August 19, 2017

Jonathan Copeland

When you get it installed you will love it. I had cancelled my GVTC internet and only had the cable TV and it "lowered" my bill from 146. A mont to 143. A month due to "bundling". I was understandably irritated and just had setup Dish Network and cut my bill down to 71 a month. Be aware that the BEC will bill your first month plus the next month on your first bill. So the first one is a doozy. Overall I am back to about the same cost as before I had the BEC fiber but at much higher speeds. They have remained consistent in the 100 up/100 down speed range give or take one or two mbs. If BEC would ever provide local channels I might be able to cancel all cable services and just go with internet services like Amazon.


Bandera Electric Broadband Pilot - Harold Schmidt

2:08pm August 18, 2017

Harold Schmidt

John Goode I see BEC fiber trucks running line at the Flying l entrance. Yea. Its a start.. he told me they have hired 2 mote crews so BEC is getting serious Happy Happy


Bandera Electric Broadband Pilot - Kenneth Johnson

11:14am August 18, 2017

Kenneth Johnson

Do you know the status of fiber to the Indian Springs subdivision on Hwy 46w? GVTC is absolutely painful! The download speed is 1.58 Mbps, upload is 0.35 Mbps and latency is 79ms. I'm more than ready for a real internet service.


Bandera Electric Broadband Pilot - Allen Marshall

2:25pm August 17, 2017

Allen Marshall
Campaign Owner

@Tom McCray - I'm not sure what's going on. I'll have one of our guys take a look at it.


Bandera Electric Broadband Pilot - Tom McCray

4:42pm August 16, 2017

Tom McCray

@Allen Marshall - I was going to send my "five postcards" again this month, but there is now a message "Unfortunately, we could not locate any neighbors near your location." I have sent postcards many months previous, including last month. Any ideas?


Bandera Electric Broadband Pilot - Allen Marshall

9:54am August 16, 2017

Allen Marshall
Campaign Owner

@William Gary - We will reach everyone with fiber eventually. You are at the end of our feeder line going around that side of the lake. That will extend the amount of time it takes to feed your area. Get all your neighbors to sign up if you can. It really does help!


Bandera Electric Broadband Pilot - Allen Marshall

9:42am August 16, 2017

Allen Marshall
Campaign Owner

@Gary Martel - We will get started in Pipe Creek in September or October. We will still be building to the pockets of the highest density of customers first.


Bandera Electric Broadband Pilot - William Gary

7:20pm August 15, 2017

William Gary

@Alan Marshall - We are in Mountain Valley Ranch on the south west corner of Medina Lake. The power line coming down the south side of the lake crosses over to us at Antone Hollow. What are the prospects for getting fiber over to us? Thanks,


Bandera Electric Broadband Pilot - Gary Martel

8:06am August 15, 2017

Gary Martel

When will you start in Pipe Creek and how long is it expected to take?


Bandera Electric Broadband Pilot - Allen Marshall

7:50am August 15, 2017

Allen Marshall
Campaign Owner

@Harold Schmidt - I can tell you it won't be that long. We have ordered a building for the Medina Lake site and power crews are checking the lines for bad poles and trees that need trimming.


Bandera Electric Broadband Pilot - Harold Schmidt

8:21pm August 14, 2017

Harold Schmidt

Oops saw fiber


Bandera Electric Broadband Pilot - Harold Schmidt

8:21pm August 14, 2017

Harold Schmidt

Alan i i was told today it would be 2 years before medina lake saw fober i hope not that long?


Bandera Electric Broadband Pilot - Harold Schmidt

1:31pm August 12, 2017

Harold Schmidt

So we have fiber at the end of whartons dock. Im just 8 miles down it. I am so ready. Check mine early today. 2.6 down. 0.2 up.


Bandera Electric Broadband Pilot - John Goode

10:59am August 12, 2017

John Goode

Harold, "here" is the Flying-L ranch subdivision. Daniel - thanks for the numbers. Looks just like they said it would be. I am so ready to be done with AT&T and <3Mbps!


Bandera Electric Broadband Pilot - Harold Schmidt

3:15pm August 11, 2017

Harold Schmidt

Daniel Shelton 50 up 50 down great.


Bandera Electric Broadband Pilot - Daniel Shelton

1:16pm August 11, 2017

Daniel Shelton

Here is my friends new numbers - just finished hooking up 50Mbps service: Service Download (Mbps) Upload (Mbps) Latency (ms) GVTC 4.98 0.46 49 BEC 52.85 50.89 19 BTW : The price for both services in the same.


Bandera Electric Broadband Pilot - Harold Schmidt

9:49am August 11, 2017

Harold Schmidt

John Goode where is here next week.


Bandera Electric Broadband Pilot - John Goode

9:02am August 11, 2017

John Goode

Anxious to hear installation and operation experience from those that already have BEC fiber. Construction in our area is scheduled to start next week.


Bandera Electric Broadband Pilot - Daniel Shelton

8:32am August 11, 2017

Daniel Shelton

Installs in the Boerne Lake area are proceeding. My friend gets his installed today and mine is set for 8/18. We will be posting speed information - he currently has GVTC and I use a Sprint card. We will also be posting information on the install.


Bandera Electric Broadband Pilot - Harold Schmidt

10:19pm August 8, 2017

Harold Schmidt

Well we are getting there We are at 46% medina lake. I will be so glad to dump rock solid. Alan how long do.you think it will take to.do.the construction.


Bandera Electric Broadband Pilot - Tom McCray

5:47pm August 6, 2017

Tom McCray

@Allen Marshall - I was going to send my "five postcards" again this month, but there is now a message "Unfortunately, we could not locate any neighbors near your location." I have sent postcards many months previous, including last month. Any ideas?


Bandera Electric Broadband Pilot - Allen Marshall

12:56pm August 3, 2017

Allen Marshall
Campaign Owner

@Tom McCray - The trigger point is 50%, but seeing the density of customers in the Medina Lake area, we are well into our plans for construction to start in late 2017 around Medina Lake. We are in the process of purchasing a new building to set at the substation site for our equipment. Keep getting your neighbors to sign up. Thanks for your support!


Bandera Electric Broadband Pilot - Tom McCray

8:20pm August 2, 2017

Tom McCray

Medina Lake at 45%. What's the 'trigger point' to get a move on in construction?


Bandera Electric Broadband Pilot - Allen Marshall

11:31am August 2, 2017

Allen Marshall
Campaign Owner

@Matthew Pica - We decided to only lease the modem because if the customer bought it and then it had an issue, the customer would not be able to deal back with Calix, our provider, because they only deal with telecom companies. With the lease we could just come and replace the modem if there was ever a problem and then deal back with Calix for warranty work. We feel this will keep things much simpler in the end. Thanks!


Bandera Electric Broadband Pilot - Matthew Pica

8:07am August 2, 2017

Matthew Pica

@Allen Marshall- I remember at the Lakehills meeting that I attended that you could either pay $200 up front for the modem, or you could pay a month to month lease fee. Is that not the case anymore? I'm speaking strictly about residential internet, not telephone.


Bandera Electric Broadband Pilot - Allen Marshall

6:36am August 1, 2017

Allen Marshall
Campaign Owner

@Harold Schmidt - The modem we use can only be purchased by telecom companies. It is needed to talk back to our equipment back at the office, therefore is mandatory along with the lease fee. Thank you for your support!


Bandera Electric Broadband Pilot - Allen Marshall

6:32am August 1, 2017

Allen Marshall
Campaign Owner

@Lenny Walden - The phone service will include unlimited calling, local or long distance, and we will most likely be able to keep your existing phone number if you want. The list of features for the phone service is amazing. I can't think of a feature that I have ever used that is not on the list, we will publish that list sometime in the near future. The maintenance plan covers any damage that might happen to your fiber optic cable inside your home, such as: cats, dogs, vacuum, whatever. It also would cover if we had to send a tech out to your house for a wireless problem that can't be solved through our help line. A static IP is usually only used in a business situation, or when a person does not want their IP address to change for a certain reason: security link, gaming, FTP server, etc. We finally have a person semi-dedicated to our webpage and Facebook page (https://www.facebook.com/BECFiber/ ) so we hope to add information soon.


Bandera Electric Broadband Pilot - Allen Marshall

6:04am August 1, 2017

Allen Marshall
Campaign Owner

@Isidoro Garcia & Perry Allen - We don't have a very specific schedule that we can share at this time. Pipe Creek, Medina Lake, and part of Bandera Zones are all under way in one form or the other. There are a lot of trees to trim and old poles to change out before the fiber goes up. Thank you everyone for your patience!


Bandera Electric Broadband Pilot - Harold Schmidt

8:57am July 31, 2017

Harold Schmidt

Lenny Walden You forgot the 10.00 a month modem rental. allen what modem do we need to buy to stop the rental.


Bandera Electric Broadband Pilot - Lenny Walden

10:03pm July 30, 2017

Lenny Walden

would like to know concerning on service plans, 1) BEC telephone @19.95 per month. ---- as far as features or rates for long distance or local calls ?? 2) is there a little more detail concerning optional services maintenance @ 7.95 per month, for fiber wireless maintenance ?? 3) the static IP address 15.00 per month each. ?? is there more information within the web page that i missed some where ??


Bandera Electric Broadband Pilot - Perry Allen

3:57pm July 27, 2017

Perry Allen

Is it possible to provide the stakeholders a general project schedule which we all know is subject to change. This will be certainly appreciated other than a general comment it is coming. We are assuming that Pike Creek and Medina Lake are being planned and scheduled.


Bandera Electric Broadband Pilot - ISIDORO GARCIA

8:59am July 27, 2017

ISIDORO GARCIA

What's the schedule for distributing Fiber in Castle Lake Ranch Area? ( Especially on Oil Well Rd )


Bandera Electric Broadband Pilot - Allen Marshall

8:06am July 27, 2017

Allen Marshall
Campaign Owner

@Lance Mingle - We are only running pipes for the fiber at this time. Unfortunately I don't believe we will have service ready this year in Regent Park. We have a few obstacles to cross with that substation being at the edge of our area. We hope to serve all the folks down there ASAP.


Bandera Electric Broadband Pilot - Lance Mingle

3:27pm July 26, 2017

Lance Mingle

@Allen Marshall - You said they are co-running the fiber in Regent Park, do you feel BECFiber will be ready in October? Or will it still need time at the substation or backend to get lite up! I want to be lite up when we move in in October!!!!


Bandera Electric Broadband Pilot - Allen Marshall

3:09pm July 20, 2017

Allen Marshall
Campaign Owner

@ Ryan Martin - We will do the wall penetration at the time of installation unless you want to do it yourself. Mr. Copeland is correct on the other points. The Calix box at the house is essential to communicate back to our Calix equipment at our office.


Bandera Electric Broadband Pilot - Ryan Martin

10:36pm July 18, 2017

Ryan Martin

@Jonathan Copeland, thanks for the clarification! It sounds like all I need now is to run a conduit through my exterior office wall for the fiber. Power, cooling and USG are already in place and functional.


Bandera Electric Broadband Pilot - Jonathan Copeland

9:42am July 17, 2017

Jonathan Copeland

@Ryan Martin Yes the BEC device (Calix GigaCenter/GigaPoint) is needed to pair back to BEC distribution points. I have the same equipment. Make sure they know you need the GigaPoint which simply provides an Ethernet handoff from the Fiber optical network of BEC. Then you can plug straight into your UniFi USG. The device is tiny and needs a 110 outlet nearby to power it. It is also an inside device and not weather proof. I have mine in my garage with copper running in my attic to my UniFi USG and then I branch out internally via copper and WiFi. Hope that helps. If you need to chat hit me up on twitter at VirtSecurity.


Bandera Electric Broadband Pilot - Harold Schmidt

2:17pm July 16, 2017

Harold Schmidt

Allen Marshall Campaign Owner @Tom McCray - We are working on some signs right now. I'll let you know if we get one that you could display for us. Thanks! im in for signs. we are at 43%. i am going to start handing out paper at the at the collection area for the sanitation dump.. that is the best way i know to get the word out.. I have been posting at all the places out here. Mailboxes ,Pool ,copper lantern , ECT cant wait. Where will the spin off building Be


Bandera Electric Broadband Pilot - Ryan Martin

11:17am July 16, 2017

Ryan Martin

@Allen Marshal @Johnathon Copeland: I live on the north side of HW 16 in Pipe Creek (near Wat Sangabucha). Just so I'm clear on how the fiber will be run, it will enter my my property via the same poles as my power and terminate near my electric meter, correct? If that is the case, I'm a happy camper as my ATT Uverse service is currently connected on that pole which is right outside my office. I have a Ubiquiti Unifi USG router/firewall as my edge device. With that in mind, is the BEC a mandatory device? Is the GPON essentially a media converter? Is it needed if my router have SPF WAN ports for fiber uplink? Thanks!


Bandera Electric Broadband Pilot - Allen Marshall

4:53pm July 11, 2017

Allen Marshall
Campaign Owner

@Deb Starr - We are watching the concentration of customers closely in Pebble Beach. Thank Y'all! @ Lance Mingle - We are installing conduit for fiber as we install power in Regent Park. We are working on the fiber connection to our substation in that area now.


Bandera Electric Broadband Pilot - Lance Mingle

7:49am July 11, 2017

Lance Mingle

I wonder if there are any plans for Regent Park off IH10 in south Boerne. Im building a home that will be finished in October and since the area is new, there is fiber being ran all over the place. Hoping for good news!


Bandera Electric Broadband Pilot - Deb Starr

3:07pm July 10, 2017

Deb Starr

Any start date for Fiber in Pebble Beach?


Bandera Electric Broadband Pilot - William Davis

10:38am July 5, 2017

William Davis

Thanks @Jonathan Copeland for posting your results. That sounds very promising. I can't wait, but it looks like it will be sometime next year before they get to us.


Bandera Electric Broadband Pilot - Allen Marshall

9:47am July 5, 2017

Allen Marshall
Campaign Owner

@John Goode - We will be mounting a box at that location so everything sounds like it should be good to go. Thanks


Bandera Electric Broadband Pilot - John Goode

8:39am July 5, 2017

John Goode

Thanks Allen. That is what I would have used (electrical conduit elbows are sweeping). Not sure what will be done at the house, but installation folks can help with that. To use "sweeping" 90 there the conduit will have to come out of the ground away from the house. I would prefer an electrical J Box (currently installed through my wall), or maybe you have your own external box.


Bandera Electric Broadband Pilot - Allen Marshall

7:44am July 5, 2017

Allen Marshall
Campaign Owner

@John Goode - You will need to use "sweeping 90s" on the conduit. They are available at Home Depot or Lowes, usually with the gray electrical PVC. Our cable will no pass through a "water pipe 90". Thank You!


Bandera Electric Broadband Pilot - John Goode

8:19pm July 3, 2017

John Goode

I want to run conduit from my power pole to my house. My plan is to use 1" conduit with two 90 degree elbows and include a pull rope. Will this be acceptable for the fiber installation? I already have a 1" conduit through the wall to the office.


Bandera Electric Broadband Pilot - Allen Marshall

4:01pm July 3, 2017

Allen Marshall
Campaign Owner

@Nancy Cox - We are getting lines surveyed and construction crews lined up to start construction in the Pipe Creek zone. Of course the large acreage areas are more difficult to serve, but we will get everyone covered with service as soon as possible. Please keep your telling your neighbors to sign up on this site. We will still be building to higher concentration areas first and will spread out from there. Thank You!


Bandera Electric Broadband Pilot - Nancy Cox

3:11pm July 3, 2017

Nancy Cox

Anxiously awaiting fiber to be laid out here. We are at the end of Vista N, just off of Bump Gate Rd. Am hoping that there will be no problem with your getting service to all of us large acreage homes out here. We are willing to pay--just need the fiber! Please comment on service to our area. Thank you! Nancy Cox


Bandera Electric Broadband Pilot - Jonathan Copeland

12:42pm July 3, 2017

Jonathan Copeland

I wish this system could let me post pictures of my speedtest. I've posted on my twitter account @VirtSecurity pictures of before and after.


Bandera Electric Broadband Pilot - Jonathan Copeland

12:08pm July 3, 2017

Jonathan Copeland

I have a completed installation here on the West side of IH10 in the Ranger Creek subdivision. From what I was told I was installation #3. I run my own speed tests and I was getting 21.4Mbs Down and 3.4Mbs up with 88msec latency on GVTC immediately before switching over to BEC Fiber. After letting things sync up the same test was run at 101.5Mbs down and 102.8Mbs up with 50msec latency. I think the hardest part for the team was that even though I had jetline run from outside to inside it was not in a conduit and had at least 1 sharp 90 degree turn and it took them a bit to get past that bend in the wall. I did get a GigaPoint ONT installed and have a DHCP ipaddress provided instead of a static. I am good with that for now as I have a Dynamic DNS setup for my system. I've tested my work VPN and connected successfully and also my VPN to my home. All of my wifi and network devices are very very happy consuming the newly available bandwidth. I've also tested running 3 amazon prime streams at the same time with no lag. Thanks BEC Fiber and BEC Fiber crews!


Bandera Electric Broadband Pilot - Jonathan Copeland

4:16pm July 2, 2017

Jonathan Copeland

@William Davis I am running mine via a Ubiquiti EdgeMax F/W along with the UniFi CloudKey/Access Points through the house and property. Will certainly update as things move forward. Current download speeds at best are 20.3Mbs Down and 3.4Mbs up from GVTC on an Arris Networks Cable DVR MCoA box they provide. It also only provides a NAT'd connection to my router. Am looking forward to having the GigaPoint in place to receive just straight un-encumbered internet.


Bandera Electric Broadband Pilot - William Davis

7:15am July 2, 2017

William Davis

Thank you @Jonathan Copeland for the updates. Please let us know when the install is completed, as well as speed tests. My situation is similar to yours, as my current setup is all cat6 cables through a Cisco gigabit router, so I should be able to just connect the router to the Calix box and be up and running.


Bandera Electric Broadband Pilot - Jonathan Copeland

11:40pm June 30, 2017

Jonathan Copeland

Today the fiber installers put in th outside box and brought over the overhead lines to my meter pole and from my meter underground through existing empty conduit to the house. They outside box is called a NIB and I am on PON1 from what I understand. Now it is just a wait until a call for inside installation. Will keep everyone updated as this moves through.


Bandera Electric Broadband Pilot - Perry Allen

2:58pm June 29, 2017

Perry Allen

@Jonathan Copeland - thank you for the update! I too am already using the CAT 6e in my house that currently goes to the Rise Broadband router. The BEC install should be very easy since it will be overhead from the pole. Has anyone had their service connected yet? If so, please give us all an update. BEC indicated that they have only one crew, hopefully, they are addressing this since one crew can only average 3 to 4 connections at best per day.


Bandera Electric Broadband Pilot - Jonathan Copeland

11:21am June 29, 2017

Jonathan Copeland

@Matthew Pica I have prewired my home for the inside installation. All you need is to know where you want the Calix GigaCenter to "live" and have a power outlet there. If you are providing your own firewall and wifi you can go with the GigaPoint device and just get an Ethernet handoff. I have run CAT6E wiring and put a small patch panel in the location where I want the GigaPoint to live and will be running this back to my firewall and wifi setup (Ubiquiti EdgeMax router and Ubiquiti UniFi Wifi solutions). This allows me to have my multiple access points and various SSIDs for different networks in my house and property. Of course I am very much a techno-geek and have the skills to do this and I also did it before it got too hot. I was visited by one of the outside installers on Monday to locate my outside box but he was surprised that they had not completed the installation from the BEC poles to my meter and put in a splice box on their pole. I still need them to come and run it from their BEC poles to my meter pole and through the buried conduit I have in place for them. I even have in place jet line to do this and jet line from the outside of my house to the inside location where the Gigapoint will go. I am over in the Ranger Creek subdivision and haven't been seeing very many trucks with the BEC Fiber logo on them for a while. It was like a busy bee hive around here for a couple of weeks and now nothing. I will likely be one of the ones who will deeply test what is setup. I am initially only going with the 100Mbs connection but may upgrade to 1Gbs if I see the need later due to bandwidth usage. Right now the jump up from 20Mbs down/3.5 Mbs up will be a huge increase.


Bandera Electric Broadband Pilot - Allen Marshall

9:55am June 28, 2017

Allen Marshall
Campaign Owner

@ Matthew Pica - We will be starting some activity in Pipe Creek this year. I cannot give you an estimated date at this point in time though. I know it is very frustrating for everyone to wait for the fiber to arrive but we will be building as fast as we can. As far as the inside installation it will be a fiber cable all the way into the home so it is beyond the ability of most homeowners. However, we will take the fiber into the home wherever you would like. We will do an analysis of the home when we get there and determine the best location for our unit to provide the best service to your home. Thank You!


Bandera Electric Broadband Pilot - Matthew Pica

9:47am June 27, 2017

Matthew Pica

@Allen Marshall. I currently live in the Mustang Crossing subdivision off English crossing road in Pipe Creek. I read that you are going to the population dense areas first and that you are tentatively starting in Pipe Creek in September. Is this area one that you are planning to come into and when would be a reasonable time that I might be able to expect to be connected, no hard date just a best guess. Also I have heard connection is to the closest room to the NID. Is it possible for me to pre-wire the inside so that I can have the connection come in where so want instead? If so what wire and specifications do I need to follow to ensure connectivity?


Bandera Electric Broadband Pilot - Allen Marshall

1:18pm June 26, 2017

Allen Marshall
Campaign Owner

@Tom McCray - We are working on some signs right now. I'll let you know if we get one that you could display for us. Thanks!


Bandera Electric Broadband Pilot - Tom McCray

8:49pm June 23, 2017

Tom McCray

@Allen Marshal - thanks. Do you have any "promotional" signs that I could plant on my lot? Something like "HIGH SPEED INTERNET COMING - go to www.becfiber.com and sign up to help" or whatever? I think this would help push things along as there is a lot of traffic with people walking lots in preparation for building...


Bandera Electric Broadband Pilot - Allen Marshall

12:42pm June 23, 2017

Allen Marshall
Campaign Owner

@Tom McCray - We should be burying conduits in your subdivision as the power goes in. We can't wait to serve your area. Get as many of your neighbors as you can to sign up on this site so that we can see where the greatest need is. Thank you!


Bandera Electric Broadband Pilot - Tom McCray

6:01pm June 22, 2017

Tom McCray

@Allen Marshal - thank you for your response. Just to be clear, the entrance to Summit Ridge is about 1.5 west of the "edge" of what your website has designated "Medina Lake Area". (CR273 is well within "Medina Lake Area" zone; CR273 is 0.5 east of the Summit Ridge entrance. The "edge" of your "Medina Lake Area" zone is about 1.0 mi East of CR273.) I agree that is bad news; hoping things change as there are many houses under construction, with 89 lots sold.


Bandera Electric Broadband Pilot - Allen Marshall

5:08pm June 22, 2017

Allen Marshall
Campaign Owner

@Perry Allen - I don't think we have excluded anyone or subdivision at this time, I'm sorry you got that impression. Yes the new building will be a communications type hut placed at the Medina Lake substation.


Bandera Electric Broadband Pilot - Allen Marshall

5:05pm June 22, 2017

Allen Marshall
Campaign Owner

@Emily Monroy - We will be building to everyone as soon as possible. It won't be feasible to build to every person in each zone as we go. We will still be following the pockets of density so that we can hook up the most people in the shortest amount of time to start with. Make sure all your neighbors have signed up on this site so we can see where the demand is greatest. Thank you


Bandera Electric Broadband Pilot - John Goode

5:01pm June 22, 2017

John Goode

At the first town hall meeting on fiber we were told that we would need to purchase the "modem" which was over $100 or paid out over time added to the monthly bill. I now see that the installation cost is $99 plus any extra needed based on the distance to the hub. Does the $99 installation cost include the modem? If I want 100Mbps and if I am close to the hub, will the total cost to me be $99 plus $69.99/month (probably plus tax)?


Bandera Electric Broadband Pilot - Perry Allen

3:58pm June 22, 2017

Perry Allen

Mr. Marshall, now I am really confused and somewhat concerned. BEC originally clearly stated that Medina Lake Area INCUDLED: ALL of Bear Spring Ranch (including CPS customers in Bear Springs Ranch), Ranchland Oaks, Summit Ridge (BEC was clearly aware of their build cycle) and Dancing Bear. So has this changed? Also with respect to the "new building" is that being placed at the substation (i.e. like a Google Fiber Hut)?


Bandera Electric Broadband Pilot - Emily Monroy

1:16pm June 22, 2017

Emily Monroy

@ Allen Marshall - Summit Ridge is directly behind my neighborhood, which is Ranchland Oaks. Since we are on the Medina Lake substation, I had earlier assumed that as the Medina Lake area is taken on, those of us connected to that substation would fall into place as you work through the members of the area. Is that an incorrect assumption? Is there some roadblock we need to consider once the substation is upgraded to handle the Fiber?


Bandera Electric Broadband Pilot - Allen Marshall

8:34am June 22, 2017

Allen Marshall
Campaign Owner

@Tom McCray - It looks like your subdivision is almost at the edge of our service area. I really don't have an estimated time for the build out but I would say it won't be within a year. Sorry for the bad news but we hope to reach everyone eventually so make sure you and your neighbors sign up on this site and if you have buried utilities to the home please bury a spare pipe for our future service. Thank you


Bandera Electric Broadband Pilot - Tom McCray

5:20pm June 21, 2017

Tom McCray

Regarding Medina Lake - I'm building in "Summit Ridge" (on CR1283, entrance to subdivision is @29°32'24.8"N 98°53'03.6"W). I expect build to be complete mid Oct 2017; there are also several other houses under construction (further along than mine) that will be done before then. Any info you can provide on availability in Summit Ridge subdivision is greatly appreciated.


Bandera Electric Broadband Pilot - Allen Marshall

4:51pm June 21, 2017

Allen Marshall
Campaign Owner

@Perry Allen - We do have plans to make some noise in the Medina Lake Zone this year. We have to install a new building before we can start serving people so the time frame is pretty broad. We hope to be trimming trees and replacing bad poles to get us started. The service contracts are available to view at BECFiber.com and all the fees are on there.


Bandera Electric Broadband Pilot - Allen Marshall

4:47pm June 21, 2017

Allen Marshall
Campaign Owner

@Harold Schmidt - It is an all fiber system from our office to the home. We will be running fiber to every area where there is a significant need, we just ask for patience while we get our lines run. BEC has about 4,500 miles of line and it will take us a while to cover that large area. Thank You!


Bandera Electric Broadband Pilot - Perry Allen

1:37pm June 21, 2017

Perry Allen

Is Medina Lake going to be scheduled for this year? We actually have more people signed up than the other areas. But our percentage is 42% (and climbing) based upon your internal formulas. Also can you confirm the pricing and also pricing for static IPs (which if available needs to be added to your product section).


Bandera Electric Broadband Pilot - Harold Schmidt

9:37am June 21, 2017

Harold Schmidt

Alen I'm 8 miles from flying L Out Wharton dock lake Medina area. So its broadband over power lines or fiber?? I don't ever see fiber out here for just the few hundred people out here. I talked to Rock solid this morning and to upgrade to decent speeds is 75.00 a month.. I have been putting notices out for people to sing up. we are at 42% now.


Bandera Electric Broadband Pilot - Allen Marshall

8:23am June 21, 2017

Allen Marshall
Campaign Owner

@Isidoro Garcia - I'm sorry we don't have an estimated build date for that area yet. We will be starting construction in the Pipe Creek and Bandera Zones this year, but not in your area yet. We will follow the greatest need as shown on this site, so if you can get your neighbors to sign up that would help.


Bandera Electric Broadband Pilot - ISIDORO GARCIA

7:48am June 21, 2017

ISIDORO GARCIA

I live in the Castle Lake Ranch area on Oil Well Rd. Work from home is ideal for my type of work that requires high speed internet. Do you know when installation of fiber would probably be scheduled in my area especially in the area of Oil Well Rd?


Bandera Electric Broadband Pilot - Allen Marshall

8:30am June 20, 2017

Allen Marshall
Campaign Owner

Hi everyone. I'm Allen Marshall, the new fiber design coordinator for BEC Fiber. Sorry some questions have gone unanswered, but we have been very short staffed with all that is going on. I hope to be available to answer questions on here from now on. @Daniel Shelton - We have installed 50 customers as of this morning and are gaining every day . We are only running one installation crew at this time, but we are very happy with their work. Everything has been running great! @Daniel Burney - You are correct. If your drop length is withing the $600 credit, the only fee for installation will be the $99. @John Goode - We are looking very closely at Flying L for installations starting this year, it will be contingent on the number of contracts we will be able to get tied down before we start construction.


Bandera Electric Broadband Pilot - John Goode

8:05pm June 19, 2017

John Goode

I read below that Bandera businesses may start installation in July because of existing fiber. I think there is also fiber to the flying-L subdivision to support the abandoned wireless trial. Is it possible that the Flying-L homes might be included in the first Bandera installations? Cable providers anly support about 1/2 of the subdivision, and AT&T "Uverse" varies from 3Mbps to less than 1Mbps depending on location in the ranch.


Bandera Electric Broadband Pilot - daniel burney

10:28am June 15, 2017

daniel burney

you state that "BEC Fiber will provide each member a $600 credit that will be applied towards their installation costs. This will cover the average overhead installation, but distance to home and other variables may increase costs". to the layman, this sounds like unless theres extra distance from the pole to the home, then other than the $99, there shouldnt be any other install fees. correct?


Bandera Electric Broadband Pilot - Daniel Shelton

3:56pm June 13, 2017

Daniel Shelton

I was just wondering if anybody in the Boerne Pilot area has been installed yet? If so, how is it going.


Bandera Electric Broadband Pilot - Perry Allen

6:28pm June 9, 2017

Perry Allen

Jonathan Copeland - thank you so much for the update! There are a number of people in the Medina Lake section wondering if BEC was having a major problem since in this case their silence is NOT golden. Would you be kind enough to update the group on your progress? Are the prices the same? How many static addresses do you get for the additional $15.00 per month?


Bandera Electric Broadband Pilot - Jonathan Copeland

10:29am June 9, 2017

Jonathan Copeland

@Perry Allen I signed the installation document sent over by BEC Fiber. It has a $99.00 installation fee for doing the inside work and the check box for which level of speed you want. There is also a check box for getting a static IP address for the fee of 15.00 per month. I am going to use a Dynamic DNS service instead of the static IP for my network. I am in the Boerne Pilot area in the Ranger Creek Subdivision. I was told that the outside portion in the next two weeks. The lines are up on my poles and have been lashed but not terminated. Then I would be contacted by the contractor doing the inside installation. Hope that helps on providing some updates and answers.


Bandera Electric Broadband Pilot - Deby Bailey

11:15am June 2, 2017

Deby Bailey

My neighbor and I attended the recent annual meeting held by BEC as we understood there would be a Q&A period after the meeting. We figured this would be a good time to hear updates/concerns regarding the status of not only Boerne, but the possible start dates for other zones. Much to our dismay there was no organized Q&A after the meeting, just small groups of people talking with each other. We did manage to grab a BEC staff member who appeared to have good knowledge of the status of the project. He told us that Bandera zone was scheduled to start in July. When we asked why Bandera first, he indicated it would be mainly Bandera business locations and this had to do with existing fiber in place. He said next would be Pipe Creek, and the schedule start time was in September. Lastly would be the Medina Lake zone and schedule start date on that zone would be December. Of course all of this is the "plan" and I'm guessing weather and other unforeseen issues could change these proposed times. Could someone from BEC respond to say if this staff member was accurate in his statements. Thank you...


Bandera Electric Broadband Pilot - Samuel Blackshear

8:28am June 2, 2017

Samuel Blackshear

I missed a comment made earlier by BEC on May 10th, where they indicated that the Medina Lake Area is very close to the 50% mark at 40%, so that seems to answer questions on the 16th and 19th about how the percentages are calculated. The most recent BEC comment indicates that they've decided to move to the planning stages in the Bandera, Medina Lake, and Pipe Creek areas, so these general areas are more or less a "Go", if I understand this correctly. One thing that I like about the Hill Country, is that the pace is slow. I hear deadlines and promises, and mentally add a few months to the timeline, and that works out about right. For an unfamiliar new venture like this is for BEC, I anticipate that there will be snags and delays. Hopefully the Boerne Pilot area will help provide some valuable lessons for the other areas. Some of these lessons may be proprietary, since there are other broadband providers working in some areas of the Hill Country, so BEC may not divulge everything publicly.


Bandera Electric Broadband Pilot - Perry Allen

3:51pm June 1, 2017

Perry Allen

BEC: As you can see we are all very anxious on this project! The questions below were sent about three weeks ago; can you please respond to the group? 1. Status of the Boerne Project? 2. Project time line for Pike Creek and Medina? 3. Availability of static IP addresses? Everyone is waiting but we need to know status since many are in the box of deciding contract renewals or new contract with the satellite providers.


Bandera Electric Broadband Pilot - BEC Fiber

2:56pm June 1, 2017

BEC Fiber
Campaign Owner

Isidoro, Thank you for your question. The zones were designed around our current electric infrastructure and population densities. Right now, the Bandera, Pipe Creek, Lakehills and Medina Lake zones are in the planning and development stages. If an address borders a zone where we are building and we are building to the neighbors, we will include that address. At this point, the zones are guide for BEC Fiber planning, but are not absolute.


Bandera Electric Broadband Pilot - ISIDORO GARCIA

8:02am May 30, 2017

ISIDORO GARCIA

Is there a reason why Oil Well Rd is in the Bandera Zone instead of Pipe Creek Zone since Oil Well Rd is in Pipe Creek?


Bandera Electric Broadband Pilot - William  Rotureau

7:02pm May 24, 2017

William Rotureau

All 5 postcards came back to me again this month. I sent you an email with more specifics. Thanks and I am keeping the faith.


Bandera Electric Broadband Pilot - Jonathan Copeland

3:42pm May 23, 2017

Jonathan Copeland

Just had the guys checking the outside design/poles for BEC Fiber on my property here in Ranger Creek. Looks like at least my section is going to have the fiber start to be run tomorrow through Friday. This includes the outside installation to the edge of the house. Any idea on how long from that point it will take to have the inside installation completed?


Bandera Electric Broadband Pilot - Samuel Blackshear

10:32am May 20, 2017

Samuel Blackshear

Static IPv6 would be awesome. Much better availability, and it's the future anyway.


Bandera Electric Broadband Pilot - Jonathan Copeland

10:03am May 20, 2017

Jonathan Copeland

@Perry Allen I just spoke with Shane and he said that they will be offering Static IP and also bridged fiber to Ethernet (aka non-NAT'ted) IP using the Calix GigaCenter 803 PON device. The issue on static IP is the cost of IPv4 addresses are high and they have not determined pricing yet to BEC customers. I suggested that they offer a Dynamic DNS service + DHCP IPv4 and static IPv6 address to those that want it. This should be feasible for most businesses and even technically advanced end users.


Bandera Electric Broadband Pilot - Jonathan Copeland

9:17pm May 19, 2017

Jonathan Copeland

I've seen them running the support wire on poles in the Ranger Creek subdivision. I plan on asking questions tomorrow at the meeting in Bandera. Anyone have some questions they want to ask? I will look here while I am there. @Perry Allen I am also interested in the static IP address question and also if they will provide transparent bridging if asked for it. I would rather have that instead of a NAT'ted connection. It makes it easier for me to setup my VPN connection on my firewall for inbound access. I understood that next week they might actually be running the branch lines down the streets and then to the outside of the house. At that point I would hope inside installlation would be pretty quick.


Bandera Electric Broadband Pilot - Samuel Blackshear

8:50pm May 19, 2017

Samuel Blackshear

I had always assumed that the percentages reflected interest vs total number of meters, but maybe there has been some misunderstanding. I do hope that this will get explained a bit more clearly. I figure that things are slow to complete in Boerne, as these types of things usually are. I'm sure that once the first people get hooked up, they'll come here to talk about it.


Bandera Electric Broadband Pilot - Perry Allen

2:58pm May 18, 2017

Perry Allen

1. What is the status of the Boerne project? 2. You indicated about three months ago that static IP addresses will be available. Has this been finally been decided and if so what price? 3. Medina Lake is over 40% and growing. Seeing this is the largest group even at 40% (based upon your chart), is BEC starting to plan or will this wait until 50% is reached. It is difficult getting people signed up without some type of project schedule. 4. Pike Creek is at 49% and I assume will be at 50% within days; has this been sent to the board? If so is what is the project schedule?


Bandera Electric Broadband Pilot - Phil Keil

6:25pm May 16, 2017

Phil Keil

I too thought I heard what Emily heard. I was wanting to go to the meeting on Saturday and hope someone will be there who can answer that question. It appears there is some confusion.


Bandera Electric Broadband Pilot - Emily Monroy

1:17pm May 16, 2017

Emily Monroy

BEC Fiber - At the Lakehills town hall meeting, there were comments from the presenters that the Medina Lake area DID NOT need to be at 50% (because of population density) to be approved to move forward. But i'm seeing comments below that we still have a ways to go to get to 50%. Which is it?


Bandera Electric Broadband Pilot - Matthew Pica

7:05am May 16, 2017

Matthew Pica

I am confused about something and would like clarification. On the comment below by BEC Fiber 2 as a reply to John Butler, it was stated that the area has to get to 50% and Medina lake is very close at 40%. On one of the updates posted not too long ago, it said that the goal was actually the 50% marker. Going by that update, wouldn't that mean Medina lake is only realistically at 20% (40% of 50%)? I am in Pipe Creek and we are at 49%, does that mean 1 more % and we hit our mark, or will we only be at 25%?


Bandera Electric Broadband Pilot - Jason Bridgeman

5:28pm May 14, 2017

Jason Bridgeman

BEC, I see your trucks quite a bit on Johns Rd west of I-10 preparing the pilot area. I have not seen any trucks on J Williams Rd, the first road off of Johns Rd. Could you tell me when installation will start for J Williams? We are all excited to get off of our flakey cellular hot spots and data caps. I refuse to use satellite because of their horrible latency times. The moment we get the letter in the mail from BEC that fiber is available, I will be scheduling install that same week! Thanks! -Jason


Bandera Electric Broadband Pilot - David storley

3:12pm May 13, 2017

David storley

BEC Fiber, We live in Steel Valley and we're so excited about the fiber project. I just wanted to say GVTC is coming in here now which I know you are aware of. Being in sales myself, I see GVTC getting a good percentage of residents here due to aggressive selling (door knockers, personal contact, mailings) of their platform and competitive pricing. Secondly, they seem to have a plan to get to the meter poles much faster than BEC. Just this morning they've run drops to 8 houses. Meanwhile the BEC contractors are busy in the next subdivision burying fiber. I foresee GVTC being operational within 1-2 weeks. I'm a huge supporter of the BEC project so I wanted to make you aware of how this is going where we live. Not that anyone asked but imho BEC should focus all the resources they can in the areas GVTC is working. Thanks for the great service BEC always provides.


Bandera Electric Broadband Pilot - BEC Fiber

2:04pm May 10, 2017

BEC Fiber
Campaign Owner

Hello William! Thank you for asking. There is no such thing as a silly question. Along 16 from Bandera is one way that the fiber could run. However, we are still in the planning phases. The zones were designed around our electric distribution system and the projects will be designed in a way to best support the electric grid. The benefit to our member of broadband service is an addded bonus!


Bandera Electric Broadband Pilot - BEC Fiber2

1:10pm May 10, 2017

BEC Fiber2
Campaign Owner

Hi John Butler, we do not have a timeline yet. The first step is getting to 50 percent, and then we will begin the construction planning. The Medina Lake zone is very close at 40 percent.


Bandera Electric Broadband Pilot - William  Rotureau

10:42am May 9, 2017

William Rotureau

Silly question. The Pipe Creek Zone is almost at 50% which means (I assume) you have to come down Hwy 16 from Bandera to run the fiber. Bandera River Ranch is approximately the same distance from Pipe Creek as it is from Bandera. Why not combine Bandera River Ranch with Pipe Creek? That would push Pipe Creek well past the 50% threshold. Full disclosure, I live in Bandera River Ranch. I figure it can't hurt to ask.


Bandera Electric Broadband Pilot - John Butler

2:02pm May 8, 2017

John Butler

I live in the Medina Lake zone. My Exede contract is up and HughesNet is now my choice for internet provider...faster, less expensive for more data, but there is a 2 year commit. I'd rather wait for BEC fiber if it's coming within a year or so. What's the rough estimate for expected timeline now that we are 40% to goal with interest? JB


Bandera Electric Broadband Pilot - John MacLean

12:01pm May 5, 2017

John MacLean

@Jonathan Copeland Cool - Thanks!


Bandera Electric Broadband Pilot - Jonathan Copeland

9:31am May 5, 2017

Jonathan Copeland

@John MacLean You can always buy some CAT5e or CAT6e cable at HomeDepot or down at Altex in San Antonio. It's not too expensive depending on length of cable. Termination isn't too hard and there are tons of instructional videos on youtube on how to terminate the cables into RJ-45 connectors either in a wall jack style or the typical cable ends you see. Look for CAT5e T-568A or T-568B wiring diagrams and pick one or the other. There is no real difference just that both ends of the cable must be wired the exact same way. A crimping tool will run $40-50 and if you need a punch down tool you can get and inexpensive one for under $20. I've used the fact that BEC Fiber is coming in to do a rework of my home network so that some of my "noisier" equipment is now in a closet where I can close the door and not be bothered with the noise or lights.


Bandera Electric Broadband Pilot - John MacLean

6:52am May 5, 2017

John MacLean

@Jonathan Copeland Bummer - looks like that will be the exact opposite side of the house where I have my current setup. Wonder how much the $600 credit covers :)


Bandera Electric Broadband Pilot - Jonathan Copeland

2:24pm May 4, 2017

Jonathan Copeland

BTW Happy May the 4th day to everyone! And don't forget to Use the 4th! May the 4th be with you!


Bandera Electric Broadband Pilot - Jonathan Copeland

2:23pm May 4, 2017

Jonathan Copeland

@John MacLean I was told by the initial survey folks that it would come in to house at the point closest to the last pole to the house. In my case that is the meter pole and will come into the garage. fortunately I have a power outlet available there and know how to run my own CAT6e wiring in the attic. I will be running a couple of CAT6e cables from where the installers bring it to a closet in my office where I have my firewall and other network gear. I am mostly interested in the type of Calix box they will be installing and if the system will provide me with what is commonly called an Ethernet Bridge. This way I can setup all of my own security on my firewall and not be hampered by anything on the Calix box or have to jump through hoops to make certain applications work properly. I am currently using GVTC and they provide me with a NAT connection and this is truly a pain. I know it's easier on them but not on me. This is one of the reasons I am jumping ship. Along with the higher connection speeds at the same price...


Bandera Electric Broadband Pilot - John MacLean

11:29am May 4, 2017

John MacLean

@Jonathan Copeland I am wondering where the connection will come into the house. Now I have the cable modem in the bedroom where the cable comes through the wall. I pretty much have to have it that way because I don't want my connection to the main computer to be wireless. I have never used fiber before.


Bandera Electric Broadband Pilot - Jonathan Copeland

11:03am May 4, 2017

Jonathan Copeland

@John MacLean I saw them in both the 2nd and 3rd. And they said they were doing the final build out before stringing onto the poles on my property. Then there will be a group that will do the meter pole to the home installation. I keep waiting too and wondered if it will be via a phone call or via email.


Bandera Electric Broadband Pilot - John MacLean

8:07am May 4, 2017

John MacLean

Saw the BEC Fiber truck in front of my house on Wed May 3 doing work on the telephone poles - now I keep checking my email for an appointment setup :)


Bandera Electric Broadband Pilot - BEC Fiber2

7:52am May 3, 2017

BEC Fiber2
Campaign Owner

Hi Isidoro, I understand you're concerned, but the Bandera zone is making progress despite the competition. BEC Fiber is offering a superior technology, higher speeds with no throttling of bandwidth and great prices. It's hard to compete with that!


Bandera Electric Broadband Pilot - ISIDORO GARCIA

5:18pm May 2, 2017

ISIDORO GARCIA

Bandera Zone - Bandera city has too many established internet service providers in which home owners and businesses may not want to change to BEC Fiber. This will be difficult for the Bandera Zone percentage to increase since the city has a higher population with internet than the rural areas included in the Bandera Zone. I work from home with Sprint being my internet carrier. I would love to get the 1 Gb service but I feel Bandera Zone wont get there if the Bandera city is included. I hope Fiber comes sooner than later.


Bandera Electric Broadband Pilot - BEC Fiber2

9:30am April 28, 2017

BEC Fiber2
Campaign Owner

Hi William, you can check the percentages in various zones any time you'd like. Click on the "Zones" tab above to stay up to date. The Bandera Zone is making progress and is currently up to 30 percent.


Bandera Electric Broadband Pilot - William  Rotureau

9:16am April 28, 2017

William Rotureau

I know y'all are very busy but, when do we get an update on Zone percentages? Just hoping to see some progress in the Bandera Zone. Thanks.


Bandera Electric Broadband Pilot - William  Rotureau

9:16am April 28, 2017

William Rotureau

I know y'all are very busy but, when do we get an update on Zone percentages? Just hoping to see some progress in the Bandera Zone. Thanks.


Bandera Electric Broadband Pilot - BEC Fiber2

2:13pm April 25, 2017

BEC Fiber2
Campaign Owner

Hi James, if you go to "My Dashboard," there is a link at the bottom under "Spread the Word" that says "invite by postcard." I'll post an update now with a screenshot to better assist you.


Bandera Electric Broadband Pilot - James Barth

1:12pm April 25, 2017

James Barth

I can not find where to go and find the post cards.


Bandera Electric Broadband Pilot - Jonathan Copeland

3:49pm April 24, 2017

Jonathan Copeland

BTW is there a timeframe for the demo equipment to be installed at the Boerne BEC office? I'd like to go see it and play with its functionality.


Bandera Electric Broadband Pilot - Jonathan Copeland

3:17pm April 24, 2017

Jonathan Copeland

So here is technical question around the Calix GigaCenter FTTH devices that are going to be installed as part of the GPON for Bander Fiber. Do the home devices/ONT allow for full bridging mode and let me turn off the wifi and NAT/firewall? If they don't currently you need to consider how to do this. I have a much higher end wifi solution for my property (UniFi wireless) and a much higher grade firewall system. If you only allow for NAT this will reduce the functionality I provide myself with and then you will be "on the hook" for providing security and patch management to my network. This in turn translates to higher liability if there is a security breach. Just my $2.00 worth as a CISSP and former CEH and all around IT professional.


Bandera Electric Broadband Pilot - BEC Fiber2

2:00pm April 21, 2017

BEC Fiber2
Campaign Owner

William, I'm sorry the post cards were returned. We will look into this matter and hopefully have it resolved soon.


Bandera Electric Broadband Pilot - BEC Fiber2

1:57pm April 21, 2017

BEC Fiber2
Campaign Owner

We are happy to hear many of you would like to be beta testers for our internet service! However, we are still following the plan, and we will determine construction according to member interest in each zone. Keep up the hard work and please continue to spread the word about BEC Fiber so that your zone will have enough interest to begin construction!


Bandera Electric Broadband Pilot - William  Rotureau

10:48am April 21, 2017

William Rotureau

Just an FYI. All the post cards I selected from the list this month came back to me with a "No such address" sticker placed over the street address by the Post Office. I don't remember where I requested them to be mailed but they were all in Bandera River Ranch with addresses on Oak Bend and Jack Rabbit. Still holding out hope fiber will come some day. Thanks for the effort.


Bandera Electric Broadband Pilot - Amanda Graybill

2:27pm April 20, 2017

Amanda Graybill

We are dying out here! Having to pay for metered internet that is very expensive and trying to run a bed and breakfast on Marquardt Rd in Sisterdale. Please, please help us!!


Bandera Electric Broadband Pilot - John MacLean

7:58am April 20, 2017

John MacLean

I am also available to try out the new service - I have a telephone pole in the front yard and live on Doeskin. John


Bandera Electric Broadband Pilot - Samantha Meyer

1:25pm April 18, 2017

Samantha Meyer

This would be great! AT&T is so slow in Pipe Creek, and they charge us so much for just having it. This would be well worth it to have faster internet, and locally operated.


Bandera Electric Broadband Pilot - Jason Chollar

9:47am April 18, 2017

Jason Chollar

Our family lives in the North Boerne Pilot project. I saw the guys out hanging the cable the other day. Yay! If you need someone to help test as a beta project, our family is pretty techy. We would be happy to volunteer as some of your first customers! ;) -jason and the Chollars. :)


Bandera Electric Broadband Pilot - BEC Fiber2

4:18pm April 17, 2017

BEC Fiber2
Campaign Owner

Hi Samuel Blackshear, thank you for your continued support of BEC Fiber. We hope that BEC Fiber will increase the quality of life of our members in numerous ways.


Bandera Electric Broadband Pilot - BEC Fiber2

4:15pm April 17, 2017

BEC Fiber2
Campaign Owner

Hi Jason Bridgeman, we are happy that you're benefiting from the updates. Once construction is complete we will be able to update you on the projected path of installations.


Bandera Electric Broadband Pilot - BEC Fiber2

4:11pm April 17, 2017

BEC Fiber2
Campaign Owner

Hi William Rotureau, we are happy the post cards are working well for you. Don't lose hope, with continued effort like yours, fiber will be in Bandera before you know it!


Bandera Electric Broadband Pilot - Samuel Blackshear

10:23am April 16, 2017

Samuel Blackshear

Some people might ask why they would need BEC Fiber if they only use the internet to check their email, or are absent from the property for most of the year. Most other broadband services, if even available, offer very limited upload speeds. This may be fine if one only wants to watch NetFlix, or something like this. However, BEC Fiber will allow upload speeds that are just as fast as the download speeds. This will open the door to those who want to monitor their properties remotely with high definition cameras. Such cameras can allow one to see what's happening on the property on a smartphone or some other remote computer. While very useful, such systems require fast upload speeds, which is something that BEC Fiber could provide.


Bandera Electric Broadband Pilot - Jason Bridgeman

8:39pm April 10, 2017

Jason Bridgeman

Thanks for today's update! I check this site every day. Do you have a projected map of which streets you will start on first and onward? Thanks!


Bandera Electric Broadband Pilot - William  Rotureau

12:42pm April 8, 2017

William Rotureau

Thanks for giving me the option to mail cards to folks living in Bandera River Ranch. I can't go door to door due to health issues so hopefully the cards will prompt others in the neighborhood to sign up. With the Bandera area still needing 1300+ to sign up to reach 50%, I may not be a around to see fiber installed but I will keep trying to get the world out. Thanks again for the effort.


Bandera Electric Broadband Pilot - Samuel Blackshear

2:00pm April 7, 2017

Samuel Blackshear

Once hookups begin north of Boerne, and customers begin reporting their results, I think interest will pick up in the other areas more quickly. The more updates from BEC as the pilot area nears completion, the better, I think. The start of the summer will probably see an uptick in interest as well, as people start dusting the cobwebs from their cabins, and checking their mail boxes. I didn’t move out here for the internet, haha, but would be happy to see it show up on the Lake within a year or so. Are there any differences in the hardware or installation for 50Mbps vs 1Gbps, or is it just an arbitrary speed cap set at the central office? In other words, if one wanted to upgrade speed later, would that be a quick phone call, or would it require different hardware, and an upgraded line to the property? Just curious.


Bandera Electric Broadband Pilot - BEC Fiber

9:56am April 7, 2017

BEC Fiber
Campaign Owner

Good Morning John, We have a very small part of Boerne separated out as our first pilot area. This was in response to an enthusiastic grassroots effort by one member. Because of his neighborhood mobilization, we had a number of people sign up for the service and the board of directors voted to go forward with the pilot. Since the project has grown and we are seeing interest across our service territory, we are encouraging the same grassroots effort among our members. Please, encourage all of your neighbors to sign up on this site. As a zone (the zones outside of the pilot are larger and centered around population areas for the time being) grows and meets the 50% target, we will be able to present to the board to begin build out. For updates, make sure to keep checking this site. If you'd like more information about how the effort started in Boerne and why we are installing there, you can find the update at https://joinbec.banderaelectric.com/#Updates


Bandera Electric Broadband Pilot - John Goode

11:53pm April 6, 2017

John Goode

The Bandera area is large, but it contains several high home density subdivisions like the Flying-L. It seems like if you would divide Boerne up and install fiber in a very small part of the larger Boerne area you would consider doing the same thing for high density areas like the Flying-L. We are just 1 mile from downtown Bandera!


Bandera Electric Broadband Pilot - BEC Fiber2

11:12am April 4, 2017

BEC Fiber2
Campaign Owner

James Hanna, we've posted a new update of all the numbers under the "Updates" tab above.


Bandera Electric Broadband Pilot - BEC Fiber2

7:59am April 4, 2017

BEC Fiber2
Campaign Owner

Hi Jonathan Copeland, member installations are expected to begin in late April.


Bandera Electric Broadband Pilot - James Hanna

7:10pm April 3, 2017

James Hanna

Thank you for your response. How many people in the Medina Lake Area are we trying to reach?


Bandera Electric Broadband Pilot - BEC Fiber2

4:30pm April 3, 2017

BEC Fiber2
Campaign Owner

Hi James Hanna, the Medina Lake Area currently has 926 backers out of 2727 total backers for Bandera Electric Cooperative's service area. The Medina Lake Area is currently 37-percent to goal. Y'all are almost there, don't get discouraged!


Bandera Electric Broadband Pilot - James Hanna

4:17pm April 3, 2017

James Hanna

I attended the Lakehills Town Hall Meeting and remember seeing a number on your powerpoint presentation for residents for the Medina Lake Area. I believe it was about 1800. Could you provide me with that number? I have been watching the number of backers grow for the entire project and our percentage is coming up slightly. I believe that we have close to 900 backers currently registered so I'm a bit confused about the percentage on the website, is it accurate? Could you let me know? I am anxious to get this project started.


Bandera Electric Broadband Pilot - BEC Fiber2

2:19pm April 3, 2017

BEC Fiber2
Campaign Owner

Hi John Goode, we understand you are frustrated with the lack of internet availability. BEC Fiber has created this project to help members like you. At this time we will not be continuing with WiFi. We are focusing our efforts on Fiber to the Home because it is a better technology for our members. If your power and phone lines are underground the fiber will follow the same underground route. We encourage you to get the word out to your neighbors to get the process started sooner.


Bandera Electric Broadband Pilot - Jonathan Copeland

1:35pm March 31, 2017

Jonathan Copeland

So how is the backbone installation going? I have seen them just north of John's Road crossing under IH10 and over on the far northern stretch of Main Street/Hwy 87 near the Appraisal District Tax office for Kendall County. Is there a projected completion date for the Project Managers on this portion? Please keep updating here and not just on the Facebook page as not all of us use Face-Palm-Book.


Bandera Electric Broadband Pilot - John Goode

9:24am March 30, 2017

John Goode

Please consider activating the already partially installed wireless system at the Flying-L as a temporary solution before fiber is available. I know everyone wants fiber ASAP, but many residents of the Flying-L would be very happy with 25Mbps (or even 10Mbps). I tried to pay $70/month for long range wireless (2 miles away), but installation was not possible due to trees and hills. There is no overhead access to the homes on my street (surrounded by golf course fairways), so cable internet is not possible (power and phone are underground to us).


Bandera Electric Broadband Pilot - Amanda Graybill

3:17pm March 29, 2017

Amanda Graybill

Please get to Sisterdale soon!! We run a bed and breakfast off Sisterdale Road on Marquardt Rd and our internet is horrible and expensive!! There are other business on Marquardt and Cravey as well.


Bandera Electric Broadband Pilot - BEC Fiber2

7:43am March 29, 2017

BEC Fiber2
Campaign Owner

Hi William, members who are registered on CrowdFiber will be contacted once construction is complete and we are ready to install in your area.


Bandera Electric Broadband Pilot - Matthew Pica

1:05pm March 28, 2017

Matthew Pica

@Jonathan Copeland: My mistake upon further research I found this link here for an install guide to the Gigacenter. https://www.dslreports.com/r0/download/2239617~6d841a29caadcc5ad26f86ba69d0061d/844-854_GigaCenter_Install_Guide.pdf This shows the fiber connection to it as SC-APC (angled tip instead of UPS which is flat is only difference I've found). Looking back I misunderstood your question and yes it looks like only copper from the Gigacenter to your equipment. The way i'm reading this, transparent bridging may be possible..From what I can tell in this guide (unless I missed something), it appears that if no ports are provisioned for residential gateway mode and it will be in transparent bridge mode. But without a configuration guide hard to say for sure. https://www.calix.com/content/calix/en/site-prod/library-html/systems-products/prem/op/p-gw-op/ae/800-spg/index.htm?toc71904237.htm?78691.htm Now if Pipe Creek can just hit 50%


Bandera Electric Broadband Pilot - Jonathan Copeland

9:09am March 28, 2017

Jonathan Copeland

@Matthew Pica thanks for the follow up. I looked at some of the PON networking and it will have to go through the GigaCenter to setup the timing and handshakes. Looks like I will be limited to Ethernet copper to my firewall. Am still hoping the GigaCenter will allow for transparent bridging and not act as a NAT firewall in front of my firewall. I hate having to deal with double NAT situations for my VPN tunnels.


Bandera Electric Broadband Pilot - William  Rotureau

2:50pm March 27, 2017

William Rotureau

Are y'all going to send out contracts for those of us that have signed up or do we need to come to the office. Either way, I'm in!


Bandera Electric Broadband Pilot - Jason Chollar

7:43pm March 24, 2017

Jason Chollar

It's so close I can taste it! If you need someone to do beta testing with, sign us up! We are pretty techy here at the Chollar house. :)


Bandera Electric Broadband Pilot - Matthew Pica

12:56pm March 24, 2017

Matthew Pica

Jonathan, per the meeting they had at Lakehills the $600 is from the pole to your house. The Gigacenter is a $200 charge that you either can pay up front or have added to your monthly bill. The fiber runs directly into the back of the gigacenter. I do not believe there is an SFP port on the gigacenter rather a built in LC connector from what I can tell. From what i've been told it's a Passive Optical Network connection if you'd like to check that out. Thanks,


Bandera Electric Broadband Pilot - Jonathan Copeland

1:47pm March 23, 2017

Jonathan Copeland

Since I have seen the backbone installers working just north of John's Rd and IH10 I was wondering if the Ranger Creek Subdivision will be early on the install schedule during April? When will we start to get dates for installation? Also Is the $600.00 installation credit for the wiring into the home or onto the property? Does it include the equipment? What type of Calix GigaCenter will be installed? Will we be able to do transparent bridging to a router/firewall and will static IP addresses be available? Is the handoff from the Calix system copper Ethernet or is there an SFP/SFP+ fiber out port on the Calix CPE device? Sorry for all the technical questions but I am reworking some of my home networking infrastructure.


Bandera Electric Broadband Pilot - BEC Fiber2

2:28pm March 20, 2017

BEC Fiber2
Campaign Owner

Hi Chris Thim, I sent an email to your direct email account regarding internet activity in your area. Please feel free to reach out to us again with any further questions.


Bandera Electric Broadband Pilot - Chris Thim

11:57am March 14, 2017

Chris Thim

I work for a medical group that will be opening a new office in Bandera later this year. When I do a lookup for the site we plan on moving into, I see that even though we are in the Bandera zone, no product is available for the location we are planning to occupy. What I need is to discuss with a BEC official about working with us to ensure this new medical practice gets the internet connectivity it needs to help the Bandera community.


Bandera Electric Broadband Pilot - BEC Fiber2

11:20am March 13, 2017

BEC Fiber2
Campaign Owner

Hi Perry Allen, thank you for your question. BEC Fiber does plan on offering IP static addresses, but the pricing model is still in development. The products page will be updated when the details are finalized.


Bandera Electric Broadband Pilot - Perry Allen

2:26pm March 10, 2017

Perry Allen

Will BEC have available static IP addresses? If so will be the projected additional cost? Will the installers run fiber to from the MPOE to the router or CAT 6? This will allow people to plan a pathway.


Bandera Electric Broadband Pilot - William  Rotureau

10:09am March 9, 2017

William Rotureau

Just sent out another 4 postcards. Didn't choose anyone on Cyprus as 3 out 5 came back "return to sender" last time. But hey, gotta keep trying so we can get the Bandera Zone off of 26% and moving upwards 😊! Keep up the good work. Can't wait to get 21st century broadband!


Bandera Electric Broadband Pilot - BEC Fiber2

9:25am March 6, 2017

BEC Fiber2
Campaign Owner

Samuel Blackshear, thank you for your questions. BEC Fiber will provide symmetrical connection to customers with no speed throttling. Installation costs will vary depending on each member's needs such as overhead versus underground installation. BEC Fiber will provide each member a $600 credit that will be applied towards their installation costs. This will cover the average overhead installation, but distance to home and other variables may increase costs.


Bandera Electric Broadband Pilot - Samuel Blackshear

5:44pm March 4, 2017

Samuel Blackshear

I realize that some of these questions might be premature, but here they are: 1. Is the service speed going to be symmetric or asymmetric? I didn't see that mentioned anywhere. 2. Roughly how much do you think installation will be? I like to budget for things in advance, the earlier the better, especially if we're talking about a few $k. 3. Is there any more information other than what is located here (TOS, further details, etc.)?


Bandera Electric Broadband Pilot - BEC Fiber2

11:54am March 1, 2017

BEC Fiber2
Campaign Owner

Robert Bailey, thank you for your concern. When people sign up and register as "anonymous" their name is not listed under backers, but we have them accounted for on the administration side.


Bandera Electric Broadband Pilot - BEC Fiber2

11:44am March 1, 2017

BEC Fiber2
Campaign Owner

Eric Sigoloff, BEC appreciates your enthusiasm. The best way to move the project along faster is to encourage your neighbors to sign up and show their interest. You can also send FREE postcards to your neighbors. Login to your account, and you will see the option to send up to two post cards per month to your neighbors. Your hard work will keep this movement growing!


Bandera Electric Broadband Pilot - BEC Fiber2

11:32am March 1, 2017

BEC Fiber2
Campaign Owner

Joshua Ellingson, thank you for your interest. You can view the speed and prices under the Products tab.


Bandera Electric Broadband Pilot - Robert Bailey

12:17am March 1, 2017

Robert Bailey

In reviewing the latest group of Backers for the Lakehills Area , I noticed several folks signing up as "Anonymous". I may have misunderstood the comments made at the Lakehills town hall meeting but I think it was said that Anonymous Backers were not counted when determining the Percentage of commitments towards reaching a zones goal. If that is true, I would like to ask that all the people that did sign up that way, to please correct their registration to include their names. If I misunderstood the rules or there has been a change, I hope that BEC Fiber will correct my comment.


Bandera Electric Broadband Pilot - Andrew Turkowski

8:45pm February 28, 2017

Andrew Turkowski

My address is in Pipe Creek but the zone is under Bandera... it's right on the border between Pipe Creek and Bandera zones. Any chance of extending the Pipe Creek zone out a bit? Looking forward to more updates on the project! Thanks!


Bandera Electric Broadband Pilot - Laura Biles

1:18pm February 28, 2017

Laura Biles

So looking forward to Pipe Creek area reaching 50%!! We're frustrated living in the dark ages. We share the same sentiments as the others listed below in our attempt to access internet.


Bandera Electric Broadband Pilot - Stuart Pyburn

3:39pm February 26, 2017

Stuart Pyburn

Pipe Creek is at 39% and climbing! Once you are done in Boerne it's a straight shot down 46 to Pipe Creek!!!


Bandera Electric Broadband Pilot - William  Rotureau

10:46am February 24, 2017

William Rotureau

I see my zone (Bandera) is up to 23% which is great, but I am trying to be patient 😁.. Out here in Bandera River Ranch the internet availability is akin to tin cans and string. I am going to the next HOA meeting and talk up BEC Fiber although I and pretty sure we have a LOT of interest/desire for fiber asap.


Bandera Electric Broadband Pilot - Scott  Horn

2:54pm February 22, 2017

Scott Horn

I'm logged in. Searched myself to see if you have me listed in zone 3, Pipe Creek. I'm not listed. Geez.


Bandera Electric Broadband Pilot - Eric Sigoloff

1:58pm February 21, 2017

Eric Sigoloff

Is there any way that we can invest in this project to move it forward faster? Our service out to our property is brutally inconsistent. I have been Begging HCTC to run fiber out here, and i would be happy to shoulder a large chunk of the cost...but that is not going to happen...


Bandera Electric Broadband Pilot - Scott Zirkel

10:46am February 20, 2017

Scott Zirkel

I live on the very edge of the Bandera Zone (just north of the boundary on 2828) . Any chance of expanding out a few hundred feet? I'm assuming that will be completed before District 5, which I'm currently in. Not sure if it is a factor in where you are drawing your boundaries or not but, the signup form shows that I have HCTC available at my address, but that is not correct. I am in AT&T's area, and they do not provide any wired internet at my location.


Bandera Electric Broadband Pilot - Joshua Ellingson

6:56am February 17, 2017

Joshua Ellingson

How fast are the upload speeds going to be?


Bandera Electric Broadband Pilot - BEC Fiber

2:03pm February 3, 2017

BEC Fiber
Campaign Owner

Andrew, the 20% is correct. Thanks for asking!


Bandera Electric Broadband Pilot - Andrew Turkowski

6:52pm February 2, 2017

Andrew Turkowski

I'm confused. In the Zones tab, it shows Bandera as 14%...but in my Dashboard profile, it shows Bandera as 20%. Which one is correct? Are we closer to our goal for Bandera area?


Bandera Electric Broadband Pilot - BEC Fiber

8:33pm February 1, 2017

BEC Fiber
Campaign Owner

Mr. Leard, I'm sorry for the change in the zones. We are actually seeing that we can expand the project, and that has caused the change. To clarify, we did add new zones, but we did not change the original Medina Lake, Pipe Creek, Bandera or Boerne Pilot zone boundaries. What may have changed are the number of meters that we can build internet to. We are learning as we go and are finding that we can offer better/faster service to more people. This is a new venture for BEC and we appreciate all of our members' patience and we do understand your frustrations. There will be a town hall meeting in Lakehills on Feburary 23 at the Lake Hills Civic Center. Please see the Facebook event for more information. https://www.facebook.com/events/175145066302170/ Please come if you can and encourage your neighbors as well. This is a great opportunity for you to ask questions of the team and BEC CEO and to find out more about the project and how BEC is proceeding and will proceed during the next stages. Thank you so much for your comments, they are very much appreciated. Please feel free to email any specific comments to PublicRelations@banderaelectric.com


Bandera Electric Broadband Pilot - Kenneth Leard

3:59pm February 1, 2017

Kenneth Leard

Just saw your new name, new logo, and revised zones and I'm not a happy (potential) customer. I have a great deal of sympathy for the "Giving Up" comment below. It is difficult to reach a goal when you keep changing the rules, the size of the field and the distance to the goal line. I was once very excited about the opportunity for faster, more reliable internet services from Bandera Electric but at this point that excitement has been replaced with frustration. A couple of days ago our area was closing in on 30% and now it shows 20% . It appears you re-drew the boundary lines of the zones increasing the numbers for some while decreasing it for others. Whatever the reason for the change, the result appears to be unfair for those who had their numbers reduced. I can't speak for any of your other customers but right now I feel like Charlie Brown trying to kick a field goal with Lucy (Bandera Electirc) as the holder.


Bandera Electric Broadband Pilot - BEC Fiber

3:11pm February 1, 2017

BEC Fiber
Campaign Owner

Thank you for your input Chris. It is always good to hear from members. We are holding a town hall meeting in Lakehills on Feburary 23 at the Lake Hills Civic Center. Please see the Facebook event for more information. https://www.facebook.com/events/175145066302170/


Bandera Electric Broadband Pilot - chris kiolbassa

11:36am February 1, 2017

chris kiolbassa

I live in Pebble Beach on the lake and most people I talk to don't know anything about this. I think there should be more info in the form of mailers, e-mails, and other media to get the word out. Also, people that I do try to get signed up are confused thinking they have to commit to a plan. I am VERY hopeful that the goal is met as I am in dire need of faster internet.


Bandera Electric Broadband Pilot - BEC Fiber

4:07pm January 30, 2017

BEC Fiber
Campaign Owner

Please don't give up! BEC is working as quickly as possible to meet member needs. We must have enough people in each area to expand our project. Please consider signing up again. We are adding more zones and hoping to have you with us through this exciting time.


Bandera Electric Broadband Pilot -  Giving   Up

4:05pm January 6, 2017

Giving Up

I signed up as one of the first 800 people interested in getting broadband internet access as the program initially stated BEC is bringing broadband internet to rural Bandera county. The Broadband project appears to be a moving target and has transformed at least twice already and the word rural is not even mentioned as it is a pure fiber solution with only two speed options which are still good deals for the price. I personally have installed and terminated miles of fiber cable and it will require some effort to keep it all up and running as there are limitations and environmental factors that you will need to worry about. For me BEC Broadband internet is unachievable as what is left in my District 2. My District 2 has been split into multiple zones of which the most populated areas downtown Bandera, Medina Lake subdivision and parts of Pipe Creek subdivision have been selectively removed from District 2. What is left is this tiny little sliver of SH 173 where I live of course. I was informed today that there is not enough interest in my district for BEC to consider doing anything at this time. For what is left of district 2 after it has been surgically diced up is mainly vast areas of open land owned by just a handful of people. A few homes where some owners only come in for very short stays and leave again. When I check my record on the Crowdfiber site it indicated that "no goal is required". I immediately thought this was a good sign and emailed BEC asking when I could expect to get the fiber internet installed if no goal was required. I received an email translation of what "no goal is required" means. The translation of the statement means "no hope in Hades you will ever see broadband internet to your home in your lifetime". Of course I was encouraged to get my neighbors interested and signed up but I did not want to drive to Houston and Dallas to do that plus some of my neighbors don't know what email is. Explaining that is a whole other issue. With all of this I decided I would just withdraw from the program as not to keep getting my hopes up that something as common place as internet will ever make it out as far as 6 miles from downtown Bandera TX. I did get a chuckle as I went to this Crowdfiber web site signed on to cancel my interest so I hit the cancel button and immediately an error message pops up "Oh no something went wrong an engineer has been notified". The only thing that went wrong is the powers to be did not have good information when they announced Broadband Internet is coming to Bandera County and now they are trying to get the most populated areas signed up to recoup what has already been spent or obligations to carriers for access are covered. I will give BEC credit they never mentioned a year to expect Broadband Internet. I recommend BEC stick to the watts and leave the bits and bytes to the experts. A Megawatt is not the same as a Megabyte. Very disappointing.


Bandera Electric Broadband Pilot - Denise Gober

9:57pm January 4, 2017

Denise Gober

I can't wait for high speed internet! Do hurry :)


Bandera Electric Broadband Pilot - Harold Schmidt

7:19am December 2, 2016

Harold Schmidt

looking forward to hearing from BEC on this offering! But i want it NOW


Bandera Electric Broadband Pilot - Ted Broa

1:10pm October 17, 2016

Ted Broa

I look forward to hearing from BEC on this offering!


There are no upcoming events


Previous October 2017 Next
Mon Tue Wed Thu Fri Sat Sun
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5